1 / 13

RoD set-up for the TileCal testbeam, 2003 period.

RoD set-up for the TileCal testbeam, 2003 period. 9th Workshop on Electronics for LHC Experiments Amsterdam, 30 september 2003 Jose Catelo, Cristóbal Cuenca, Esteban Fullana, Emilio Higón, Belén Salvachúa, José Torres Universitat de València. RODdemo installation.

zahina
Download Presentation

RoD set-up for the TileCal testbeam, 2003 period.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RoD set-up for the TileCal testbeam, 2003 period. 9th Workshop on Electronics for LHC Experiments Amsterdam, 30 september 2003 Jose Catelo, Cristóbal Cuenca, Esteban Fullana, Emilio Higón, Belén Salvachúa, José Torres Universitat de València

  2. RODdemo installation • Motivation: first time we install a readout system with complete I/O optical fibre and DSP processing capabilities implementing online algorithms like Optimal Filtering in a testbeam environment. • Objectives: • Gaining expertise in a closer-to-ATLAS environment. • Testing the RODdemo in with input/output S-Link. • Processing real data with several online algorithms (Optimal Filtering and Flat Filtering) • Not disturbing the actual ROD Emulator (i.e. parallel working)

  3. FEB Electronics (DRAWER) Testbeam’s ROD emulator + ROS 8 DIGITIZERS (48ch: 2 TileDMU/3ADC each) Data RODdemo + Data acquisition workstation Testbeam TTC system DISTRIBUTION Parallel readout • No interferences with working RODEmulator data acquisition • Test the dual fiber readout of the interface link Interface Link Optical Splitter LC conn. TTC

  4. Testbeam TTC system FEB Electronics (DRAWER) PCI Bus Integrated ODIN LSC CT SBC (VP110) NetWork ROD control+DAQ ROB (linux_PC) P3 P1 P2 RODLib + Online root_ctrl RODLib + Online root_ctrl FIFO+Data management Int. Link Pattern generator or Digitizer data Input FPGA DATA and TTC FIFO Input FPGA DATA and TTC FIFO PU DSP6202 @250MHz RoD Crate (9U) RCC ODIN LDC Interface Link TTCpr S32PCI64 DSP OF. Algo. ODIN LDC ROD Demo TM4Plus1 IntegratedODIN core IntegratedODIN core RCC DHCP kernel+NFSSimple Data Dump App

  5. RODdemo testbeam status • TTC: TTCpr software application using dataflow and vme_rcc drivers and sending the TTC info to VME slave module (RODdemo). OK! • Dataflow: • I/O slink transition module TM4Plus1: • Data input firmware OK! • Data output firmware: problem with integrated ODIN LSC. Manually fitted into APEX fpga. OK! • DSP Processing Unit: • DSP: New DSP online algorithm developed in “C” for testebam set-up. OK! • Input FPGA firmware: Solved initial problems. Now is implemented the TTC FIFOS and data storage in Dual Port Memory. OK! • ROB emulator workstation:Simple program for dumping the acquired data is done. OK! • Control and monitoring: • Standalone applications running in RCC with Dataflow and RODlib libraries. This application also polls PCI bus (ttcpr) for getting TTC info and sending it to VME ROD module. OK!

  6. Online Algorithms implementation • Implemented 2 online algorithms for offline validation: OF and FF. Optimal Filtering Flat Filtering

  7. Preliminary results. Analyzing binary dumps with ROOT (Ttrees) Energy reconstruction for PMT 16 of B+ All of them in ADC counts. Optimal Filtering Energy Reconstruction OF Offline OF DSP OF (DSP-Offline)

  8. Preliminary results. Analyzing binary dumps with ROOT (Ttrees) Flat Filtering Energy Reconstruction Energy reconstruction for PMT 16 of B+ All of them in ADC counts. Pedestal no subtracted. FF Offline FF DSP FF (DSP-Offline)

  9. Commissioning

  10. Commissioning • The data acquisition system requirements: • Input Links (main constraint): 12 drawers • Processing power: not essential • Trigger rate: ~ 1 to 100Hz. • Trigger system hardware: • Optical: from TTCvx/ex to a TTCpr • FEB trigger: The trigger could be recover from data at arrival, because the S-Link recovers a data triggered when a header 0x51115110 control word and CAV line is asserted. • The Hardware availability for the test dates could define which ROD set-up to be used (all need a 9U crate): • 2 final ROD motherboards without PUs • 2 final ROD motherboards with 2 PUs each

  11. Diagram & HW needs with final ROD motherboard without PUs • The trigger should be recovered from data or VME trigger with TTCpr mounted on a SBC (rod controller). • The DAQ computer could be a SBC CT-VP110 that configures the crate and could readout the motherboard with VME bus at lower rates • We need to program staging FPGA for send data directly to VME FPGA and finally to SBC. There is a low speed data path available for this and enough for cosmic ray set-up data rates. • Hardware needs: • 2 ROD motherboards: available between half and end of October. For the new board we change some tips in schematics for trying to solve the initial g-link clock lock problem seen in initial prototypes at university of Geneva for 40Mhz clock. • 1 SBC: The recommendation is to use the ATLAS standard SBC from concurrent technologies. The Valencia group has one available, configured for network booting and tested in lab and at testbeam with a TTCpr card mounted. • 12 multimode standard fibers. The g-link inputs of rodmotherboards are ST type as the drawers, so no adapter is needed.

  12. Diagram & HW needs with ROD motherboard with PUs • The trigger and DAQ would be implemented with TTCpr and SBC CT-VP110 as well as in the previous configuration. • With the Pus, we can test them on final ROD and implement some algorithm in DSP if needed. • Hardware needs: • 2 ROD motherboards • 4 Processing Units: we expect to receive them for the beginning of November. (Input FPGA and new DSP require programming from scratch) • 1 SBC • 12 multimode standard fibers ST-ST

  13. Conclusions The goal was reached. We close the readout chain between the drawer and the ROB with I/O optical links and DSP processing. We need to complete the preliminary analysis from physics data acquired. (results on http://ific.uv.es/tical/rod/ROD_Pages/data_f/rod_data_format.html) Commissioning will give us an essential expertice with ATLAS-like configuration.

More Related