BART. EARTHQUAKE. SAFETY PROGRAM. Northern California Earthquake Hazards Workshop February 12, 2014. Program Objectives. Render BART system earthquake safe under Design Basis Earthquake (DBE). In general, “safe” = “noncollapse”.

zalman
Download Presentation

EARTHQUAKE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BART EARTHQUAKE SAFETY PROGRAM Northern California Earthquake Hazards Workshop February 12, 2014

  2. Program Objectives • Render BART system earthquake safe under Design Basis Earthquake (DBE). In general, “safe” = “noncollapse”. • To the maximum extent reasonable and prudent, retrofit portions of the system to operability under the Lower Design Basis Earthquake (LDBE). “Operability” = return to train operations within a short period of time (1 -2 weeks)

  3. Seismic Standards

  4. Original Program Scope

  5. Current Program Scope

  6. Status of Earthquake Safety Work

  7. Remaining Work • Retrofit Fremont Line aerial structures between Lake Merritt and Coliseum • Complete 10 stations (7 in construction now) • Upgrade 4 aerial structure piers along Richmond Line • Retrofit interior liner in Transbay Tube (3 areas) and upgrade pumping system • Expected completion: Fremont Line 2018, Transbay Tube 2023

  8. EQ Damage Prediction

  9. Other Seismic Preparedness Efforts • Earthquake Early Warning System: Provides advanced warning (15 sec to 1 min) of large earthquake ground motions approaching the BART system. • Primarily for warning of distant earthquakes. • Tied to BART train control system – slows trains to reduce derailment or other possible effects. • Feasibility study for retrofit of Berkeley Hills Tunnel, which crosses the Hayward Fault.