An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TABLE OF CONTENT • FITA • FRAMEWORK TRADE MISSION • SECTORIAL ISSUES 3.1 Waste management 3.2 Water management 3.3 Renewables 3.4 Inlandnavigation 3.5 Infrastructure 3.6 Logistics BRIEFING SEMINAR SECTORIAL TRADE MISSION CROATIA Brussels, 25th November 2011

  2. 1. FITA • FITA vzw stands for FLANDERS INTERNATIONAL TECHNICAL AGENCY • Founded 1991 • Integrated within the Flemish Ministry for Public Works

  3. 1.1 The main aims of FITA are • Making Flanders’ achievements known abroad, in various areas connected with infrastructure and equipment, traffic and environmental problems, town planning and country planning and housing ; • Fita also deals with the promotion of the participation of the Flemish business world (engineering companies, consultants, building contractors, producers and suppliers) in investments abroad by offering technical assistance and logistic and administrative support e.g. by putting governmental experts available to fulfil international assignments ; • FITA organises tailor-made visits and trainings in Flanders; • FITA organises tailor-made trade missions abroad with added value (b2b)

  4. 1.2 Principal FITA achievements • Inland waterway transport on Magdalena River and dredging works in the ports of Baranquila and Buenaventura ( Columbia) • Mekong Navigation Master Plan Cambodia • Technical Assistance to the Hungarian Ministry of Environment in the field of waste management planning and waste information management. • Powering Harbour Development in S.E. Asia using renewable energy. • Panama Canal

  5. 1.2 Principal FITA achievements =) CONCEPTUAL DESIGN OF ROLLING GATES FOR NEW POST-PANAMAX 3rd LOCKS ON THE PANAMA CANAL • Concept / engineering design • Review of contractor designs + technical supervisionduring execution • Advise / expertise / technical specifications • Material approval + welding, painting control • Inspection (maintenance, repair)

  6. Panama CanalLock site (3rd lane - Pacific end) Existing Miraflores (Lock site (3rd lane - Pacific end) 2 step) locks

  7. Panama Canal

  8. Concept design Post-Panamax Locks  geometry • Length : 426.8 m • Width : 55 m (61 m) • Min. depth sill : 16.8 m (18.3 m)

  9. 2.1 BRIEFING SEMINAR • OBJECTIVES BRIEFING SEMINAR • FRAMEWORK TRADE MISSION -) Seminars – b2b – networking - sitevisit • DESTINATION: Zagreb – Rijeka • DATA TRADE MISSION: spring 2012 -) except IFEST (W7/2012) -) BATIBOUW&MIPIM ( W9/2012 ) • CHAIRMANSHIP: ? • PARTNERS:

  10. 3.WASTE MANAGEMENT3.1 Current situation • Waste management priority • Transposition of EU legislationcompleted • Municipal waste: 403 kg/capita ( 2008 ) • Growing awareness of the needtoavoidandreduce waste streams • Organisedmunicipal waste collectionincreasedfrom 86% ( 2004 ) to 93% ( 2008) • Landfilltradition

  11. MUNICIPAL WASTE

  12. WASTE MANAGEMENT3. 2 INSTITUTIONAL FRAMEWORK • The Ministry of Environmental Protection, Physical Planning and Construction (MEPPPC) is responsible for administrative and other tasks related to generalenvironmental protection policy and achieving the conditions for sustainable development. • The Croatian environment agency (CEA) has the obligation to analyse and interpret the collected environmental data and provide, to the state administration, the Government and the Parliament, the information necessary for efficient implementation of the environmental policy. • The Environmental protection and energy efficiency Fund (EPEEF), from its founding in 2003, performs financing, preparation, implementation and development of programs, projects and related activities in the field of conservation, sustainable use, protection and improvement of environment and in the field of energy efficiency and renewable energy use. The Fund is financed by funds raised through different taxes imposed on the environmental polluters.

  13. 3.3 MAIN CHALLENGES 3.3.1 Locatinglandfillsand public oppositiontositing new facilities, especiallyincinerators • Public awareness andcommunication • Example: Zagreb W2E plant - constructionplannedfor 2018 - 385.000 T municipal waste & sludge - EIA -

  14. 3.3 MAIN CHALLENGES 3.3.2 OtherRegional Waste Management Centres • Bikarac ( Sibenik – Knin county) 8.9 mil € • Kastijun ( Istriacounty) 39.3 mil € • Mariscina ( Primorje – GorskiKotarcounty) 49.3 mil € -) Construction new municipallandfill & MBT - plant -) Closing&remediationexistingones, transfer stations =) Croatia is veryambitious in waste management andthus more heavy investment projectstocome =) Max. 21 WMC ( MBT + 1 W2E plant) =) Financing: 80% ( EU) + 20 % ( local/regional level ) =) Overall investment needs to establish regional waste management centers in Croatia are estimated at 400 mil.€ including landfill sites, mechanic-biological treatment plants, transfer stations, and other supporting infrastructure.

  15. 3.3 MAIN CHALLENGES 3.3.3 Island waste collection • Logisticallydifficulttoimplement • Waste strategyenvisionsferriesto the mainland

  16. 2.2 MAIN CHALLENGES 3.3.4 Weakcapacitytodevelop &manage projectsamongmunicipal waste management co’s • Needfor a strong project pipeline forabsorbingavailablefunding • Manyprojects small in size 3.3.5 Inadequate waste flow andcomposition data deters private sector operators. • Guaranteessignedagreementsby private sector • Higher level of environmentalprotectionlandfills 3.3.6 Households – level of affordability

  17. 3.3 MAIN CHALLENGES 3.3.7 Landfills – remediation in progress • 299 “ official “ landfillstoberemediated • Municipal Waste LandfillsRemediationCost ( 387 mil €) financingby EPEEF ( 55 %) andregionalgovernmental units • 2010 - 76 municipallandfillsremediated - 606 uncontrolled dumping sites • Transitionalperiodrequestedfor: - remediation of landfillsfor 2018 - gradualreduction of biodegrable waste to 35 % by 2020

  18. 3.3 MAIN CHALLENGES 3.3.8 Packaging Waste Return and/or collection of used disposable PET packaging is organisedthrough points of sale against the payment of refundtoconsumerspursuantto the Ordinance on PackagingandPackagingWaste. The quantitiescollected are steadilyincreasing in line with the trend of growingquantities of packaging on the market.

  19. 3.3 MAIN CHALLENGES 3.3.9 Conclusions Key issues are: • increase in solid waste • very limited recycling rates • unreliable data concerning waste flows and quantities • lack of organized disposal sites.

  20. 3.2 WATER MANAGMENT3.2.1 Institutional framework Water management in Croatia is under the responsibility of the Ministry of Regional Development, Forestry and Water Management and the implementing public institution – Croatian Waters (Hrvatskevode). Current situation • Supply of drinking water ( 80 % ) • Main challenge for wastewater sector - Rather low connection rate public sewerage: 40 % - Sewerage infrastructure outdated ( leakages, deformations, …) - EBRD is providing most of the loans for public WWTP and sewerage projects. EIB is providing loans for smaller priority &investment projects - 5 bil € needed (estimated )

  21. 3.2 WATER MANAGMENT3.2.2 Projects • 3.2.2.1 Ongoing projects - SlavonskiBrod ( 30 mil € ) - Knin ( mil 15,5 € ) - Drnis ( mil 6,5 € ) • 3.2.2.2 Future projects - Sisak ( 30 mil € ) - Kastela Bay ( 117 mil € ) - Karlovac ( 36 mil ) - Nova Gradiska ( 13 mil €) - Dakovo ( 25 mil. € ) - Vrbovec ( 17 mil €) - Porec ( ? mil €)

  22. 3.3 RENEWABLES Currentsituation • Sun & Wind primaryrenewable sources =) Solar energy beingunderutiliseddespiteextensivepotential =) Low share of renewable energy sources in primary energy production: 1 % ( 2004 ) upto 6 % ( 2010 ) excluding large hydro-electricity plants. =) An outdated energy infrastructure and a sluggish bureaucracy are some of the obstacles to developing RES in Croatia =) 20 – 20

  23. 3.4 INLAND NAVIGATION • Danube – Sava Chanel ( 61 km.) • Inland Port Development • Improvement / upgrading navigability inland rivers

  24. 3.5 INFRASTRUCTURE • The Ministry of Sea, Transport and Infrastructure is competent for: - Measures for the protection of the Adriatic sea, islands and coastal regions and their sustainable development; • Control over business concessions for domestic and international marine, boating, road, rail, air, postal and telecommunications and river transport; • Strategy for development of all forms of transport ( incl Seaports and inland waterways) • Inland freight-transportation centers; • Airports & Telecommunications; • The organization of strategic infrastructure projects and investment programs of special importance for the Republic of Croatia; • Organization of major infrastructure investment projects in building construction and equipment of water management of transport infrastructure. =) Croatia will modernise 200 km of railway lines, amounting 0.5 bil € ( project to be launched by 2013)

  25. 3.5 INFRASTRUCTURERIJEKA GATEWAY Rijeka Gateway Project or Rijeka Traffic Route Redevelopment Project is a complex development program aiming to redevelop port/city interface and to improve the port traffic connection with the international road and railway corridors. http://www.rijeka.hr/OpenDaysDevoted

  26. 3.6 LOGISTICS • In the field of logistics, Croatia has no experience - new business area! • Educational framework is not defined and there is no education in this field. • Multimodality almost unknown in Croatia except for the ports of Rijeka and Ploče • Those 2 projects might give a boost in logistic activities for Croatia.

  27. CONCLUSIONS Croatia has: • High ( technical )qualityeducationstandards • A comparatively developed infrastructure • Several bureaucratic hurdles • Croatia is a pioneer in the acceptance of new technologies, especially in data transfer technologies

  28. MARKET INFO Market Reports: • Waste andwastewater treatment in Croatia ( May 2010, Trade Office for Brussels and Flanders Regions ) • Renewable Energy in Croatia ( March 2011, Trade Office for Brussels and Flanders Regions ) • Sector Analysis Energy and Environment ( November 2010, Trade Council, Embassy of Denmark) • Transport and Logistics in Croatia ( 2010, Trade Office for Brussels and Flanders Regions ) • Rijeka Gateway illustrated ( 2010, Worldbank ) =) Send your request to fita@vlaanderen.be