TPTF Update Credit Requirements for Nodal. Cheryl Yager June 24, 2008. Overview. Credit Work Group involvement Draft NPRR Transition thoughts Other topics. Credit Work Group involvement. May 28 th meeting Reviewed interface with CRR and DAM systems Reviewed TPE report formats
E N D
TPTF UpdateCredit Requirements for Nodal Cheryl Yager June 24, 2008
Overview • Credit Work Group involvement • Draft NPRR • Transition thoughts • Other topics
Credit Work Group involvement • May 28th meeting • Reviewed interface with CRR and DAM systems • Reviewed TPE report formats • Discussed items to be addressed • Discussed transition plan options • June 27th meeting • Potentially recommend a NPRR • Weighting factors for CRRs • Discuss DAM credit constraints • Will continue to meet monthly to address Nodal topics as needed • Review by CWG being considered as timeline is reviewed
Draft NPRR • As the credit portion of the Nodal project has progressed, have noted several areas in Nodal Protocols that should be addressed: • Remove duplicate “90%” of ACL language • Remove forward component for CRR valuation from DALE and ADTE calculation. Forward CRR valuation is captured in the FCE component. • Propose alternate values for forward pricing for CRRs when no price is available. Hub price is discussed in the Protocols but is not readily available. Propose using ACP. • Eliminate the 2 day prepay requirement. All invoice payments made will be removed from credit requirements the next day. • ERCOT has drafted a NPRR and will review with CWG on Friday • If approved by CWG, the NPRR will be filed
Transition thoughts • Goals for a transition plan • Ensure that collateral held during transition matches risk • Not too much • Not too little • Use general rules that are understandable and reasonable to implement • Be adaptable • If the general rules don’t fit a company’s circumstances, use flexibility to ensure collateral held matches risk
Transition thoughts • Components to consider • Current Credit Exposure (CCE) • Estimated Aggregate Liability (EAL) • ADTE – estimated historical and projected RT activity • OUT – outstanding invoices and historical activity not captured in ADTE • DALE – projected DAM activity • Aggregated Incremental Liability (AIL) • Reasonableness test for ADTE for RT activity • Future Credit Exposure (FCE) • Estimated forward value of CRRs held
Transition thoughts • Considered several options • Talked further with project team • Currently developing a plan around • importing historical invoice, settlement statement data and estimates into the Nodal CMM system to establish baseline calculations for ADTE, OUT and AIL. • allowing DALE and FCE components and other DAM and CRR values to “roll in” as activity builds • Note: Using Zonal data to estimate Nodal activity presumes that RT activity will be similar in Nodal • To the extend RT activity in Zonal is expected to differ from Nodal, ERCOT staff expect to adjust ADTE or other components accordingly. • Transition plan is still being developed and will be reviewed with CWG and TPTF.
Other topics • Review credit limit example • Review external reports • Review proposed weighting factors • Discussion items for CWG • Application of DAM credit limit – alternate proposals • CRR credit • Review proposed change to the ACPE minimum • “Final check” credit monitoring before CRR auction results are posted?