Current Status and Development Plans for the Nuclear Power Sector in Russia: Generation Capacity, and Fuel-cycle Approaches. Map of Russian NPPs sites. 10 NPPs, 31 units, N уст. =23242 MWt. Russian NPPs generation in 1992-2005. The dynamic of failures of Russian NPPs in 1992-2005.
E N D
Current Status and Development Plans for the Nuclear Power Sector in Russia: Generation Capacity, and Fuel-cycle Approaches
Map of Russian NPPs sites 10 NPPs, 31 units, Nуст.=23242 MWt
Radiation and environmental safety at NPPs in 2006 • Noincidents associated with radiological consequences and environmental pollution. • Radioactivityof gas-aerosol effluents and liquid releases does not exceed the permissible values. • Maindose limits are metat all the NPPs.
Main issues in operation of Russian NPPs in 2004-2006 • Metal corrosion and erosion processes • Faults in operation of electric equipment • Natural impacts
Examples of erosion-corrosion destructions 23.03.06 3SMODamage of low-pressure steam lines at turbine generator 6 of Smolensk NPP
22.01.06 1KUR.Damaged equipment of the openswitchyard 330 kV
Volgodonsk NPP(January 29, 2005) Intake channel covered with the ice
Natural impacts (birds) 7 failure of the open switchyard electric equipmentoccurred in the period 2001- 2006 due to the birds: Novovoronezh – 1 event; Leningrad – 2 events; Kursk - 4 events
Main areas of activities in 2004-2005 • Upgrading and LTE • Improvement of the NPP effectiveness • Improvement and ensuring of NPP equipment reliability • Management of SNF and RW • Preparations to decommissioning • Emergency preparedness • Human factor
UPGRADING AND LTE Factors promoting the performance of NPP lifetime extension (LTE) activties • Conservatismof the previously accepted design basis for justification of the 30-yearslife time for the operating NPPs • Large scope of upgrading activitiesimplemented during the design life time • Specific costs for NPP lifetime extension aresignificantly lowerthen the investments required for construction if new NPP units NPP operation experience allows to justify the revision of the previously accepted NPP lifetime durations
RW AND SNF MANAGEMENT Radwaste management facilities taken into operation in 2004-2006 • Kursk NPP unit 1 solid radioactive waste storage; • Kursk NPP radwaste accumulation and sorting facility; • Smolensk NPP liquid radwaste storage 2; • Solid radwaste temporal storage facility in the turbine hall of Smolensk NPP; • Storage polygon for the waste containing raidionuclides in permissible values at Balakovo NPP.
RW AND SNF MANAGEMENT Improvement of the SNF management Main pending issues – safety ensuring in SNF storage and transportation from the NPP sites. Ways of resolution: • Implementation of the facilities for cask-type storage and transportation of the SNF from the RBMK NPPs; • Construction of the centralized dry storage for SNF from RBMKs and VVERs at Krasnoyarsk; • Establishment of the facilities ensuring removal of the SNF from the AMB reactors of Beloyarsk first stage; • Construction of additional SNF pit at Bilibino.
Forecast of electricity generation in Russia(Energy strategy of Russia for the period to 2020)(approved by the Decree of the Russian Government dated 28.08.03 №1234-р) Optimistic bln.kW.hr/year TOTAL Medium At NPPs In the European part of Russia: Growth of the NPP generation share to 30%; Growth coverage – to 50% in average
In particular before 2030 to implement 40 GWt of electric power in the country and almost the same amount abroad. To achieve this it is necessary: 1. Uranium problem 2. The problem of SNF and radwaste 3. Machine-building base 4. Constructional base 5. Road-map
Construction policy 1. Units completion (from 3 to 5) which have already been started to be built 2. To prepare NPP project – 2006 To take all the best which exists on PWR and to prepare and make a standard project. To ensue the construction velocity up 2 units to 2010. 3. By 2010 to realize the PWR project corresponding the best international models and to realize their serial production between 2010 and 2020 4. By 2020 dimensioned scientific and further nuclear energy development must be realized
In the version of experimental-industrial complex creation for next generation nuclear fuel cycle processing: • To finish reactor BN-800 construction at Beloyarsk NPP • BN-800 is necessary for practical confirmation of new safety level, new fuel type, construction materials and closed fuel cycle. It’ll be implemented in 2012-2014 • Nowadays everything is restrained because of fuel production lack (the main question is where and how MOX fuel will be produced
In the version of dimensioned serial construction of commercially effective units of generation with fuel production and SNF reprocessing Fast reactor based on sodium technology: • Development of head licensed project of commercial NPP-2014 • Production of the first loading in the Complex – 300 – 2018 • Creation of fuel production for serial NPPs – 2020 • NPP putting into operation (building) – 2020 • Creation of SNF reprocessing production - 2025
Specific indices: • Prime cost – 3 cents per 1 Kw/h • Specific cost – 1000 per 1 Kw/h • Annual delivery of electric power – 13500 Gw/h a year • Lifetime – 60 years • Staff coefficient – 0,35 pers/Mw • Coefficient of reproduction – 1,3 with the possibility of increase to – 1,5
In Russia not less than 1,0 Gw a year • Fast reactor with plumbum coolant (FRSC) – creation of commercial block with fuel production and SNF reprocessing is possible by 2030 • High-temperature graphite reactor for energotechnological use (hydrogen and etc) and electric energy production – prototypical unit by 2017 and the head four unit NPP with fuel production by 2025 • Regional NPP Floating NPPs on the basis of energy facilities from ice-breakers are viewed. The first NPP is being built in Murmansk
Desirable and expected composition and structure of reactor park of Russia: • 2020 – 45 Gw TR • 2030 – 50 Gw TR and 5 Gw FR • 2040 – 55 Gw TR and 15 Gw FR
Level of readiness of Russian nuclear industry engineering base for realization of the next generation nuclear fuel cycle creation project In the version of experimental-industrial complex - Technical project BN-800 is approved and there’s a license for building and construction has been started. - Creation of BN-800 is a necessary step before creation of commercial reactor: - Technology of MOX fuel production was elaborated and tested: - There’s readiness for development of technical project for fuel production. - In BN-800 commercial reactor fuel capacity should be proved; - SNF reprocessing was tested in Research Institute and is ready for realization at RT-1 (variant without separation of uranium and plutonium is possible).
In the version of serial construction of commercially effective power units of next generation with fast reactors. • Initial phase, elaboration of commercial reactor conception. • All the complex of activities with the sodium coolant technology confirms possibility of development of necessary technologies for the projects of commercial reactors and nuclear fuel cycle facilities. • There aren’t constructional materials for deep fuel burn-out • There’s no project for fuel production
Spent fuel management Fuel of WWR-440 reactor type is reprocessed at the plant RT-1 at the Urals. Fuel of WWR-1000 and RBMK in Krasnoyarsk region. Pond storage (“wet”) (Spent fuel storage-1) SFS-1 capacity for SNF of WWR-1000 is 6000 tons (by uranium dioxide). SNF for storage is received from three Russian NPPs (Novovoronezh, Balakovo and Kalinin), four Ukranian NPPs (Southern-Ukranian, Zaporozhskaya, KHmelnitskaya, Rovenskaya) and one Bulgarian NPP (“Kozloduy”). SNF reception is foreseen at Volgodonsk NPP.
Design storage volume of RBMK-1000 SNF of launching complex is 5082 tons (U) Design total volume is 37785 tons (U), including: 26510 tons (U) – РBМК-1000 11275 tons (U) – WWR-1000 Real amount of SNF isn’t shown in tons U, but in uranium dioxide tons (UО2), because this dioxide is nuclear fuel. Thus real amount of SNF at a dry storage is: 37785 × UО2 / U = 37785/238 = 42865 tons UО2.