Doing Business with Bechtel Parsons Blue Grass

Doing Business with Bechtel Parsons Blue Grass. September 26, 2007 Diane Osbourne Small Business Advocate. Introductions & Safety Topic. Safety Topic Introductions Evan Carlson, Field Procurement Manager Gary Cough, Construction Manager Dave DuRegger, Subcontracts Manager

zaria
Download Presentation

Doing Business with Bechtel Parsons Blue Grass

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Doing Business with Bechtel Parsons Blue Grass September 26, 2007 Diane Osbourne Small Business Advocate

  2. Introductions & Safety Topic • Safety Topic • Introductions • Evan Carlson, Field Procurement Manager • Gary Cough, Construction Manager • Dave DuRegger, Subcontracts Manager • Denise Hart, Procurement Manager

  3. Current Project Staffing • Bechtel Parsons Blue Grass Team currently employs personnel located as follows: • Richmond, KY: 60 (18 local hires) • Jobsite: 27 • Pasadena, CA; Pasco, WA; Columbus, OH and San Diego, CA: 317 • Subcontractor and Direct Hire construction workers on site: 45 - 50 each day and growing Richmond, KY Jobsite Jobsite

  4. Construction Work nearing completion • Access road 99% complete except for guard rail work • Roadway Concrete/ACB Potable Water & Sewer (100% complete) • Perimeter Fencing (100% complete) • ACB Electrical Power and Roadway (58% complete) • Access Control Building (81%) • Active Security Vehicle Barrier (84%)

  5. Construction Near-Term Work • Subcontracts • Badging Facility • Subcontract awarded on July 29, 2007 • Personnel Support Building • Subcontract awarded on June 23, 2007 • Maintenance Building • Subcontract awarded on June 25, 2007 • Access Control Building Canopy • Currently bidding • Underground Material • Purchase Orders have been awarded and the majority of the material has been received on site for: • Storm Drainage, Sanitary Sewer • Electrical Ductbanks/Lighting/Grounding • Fire Protection and Process Water Piping

  6. Construction Future Work • 138 KVa Main Power Substation & Pole Line • Subcontract Awarded on July 26, 2007 • MDB Horizontal Concrete Material (Rebar/Embeds/Formwork)* • Permanent Plant Equipment • * Contingent upon receipt of an authorizing Notice to Proceed from the Government to perform the work

  7. Acquisitions As of 30 August 2007: 94.9%

  8. Bechtel Supplier and Contractor Portal • All interested companies are required to register on the Bechtel Supplier and Contractor Portal- http://supplier.bechtel.com • Dunn and Bradstreet Number • Bonding capacity, bid range • Annual sales • Area of expertise, work experience • Business size classification • Information is utilized to assess interested company’s capability • You may also e-mail a letter of introduction & company capabilities to the Project Small Business Advocate

  9. Bechtel Supplier and Contractor Portal

  10. Prequalification Process • Most RFP Opportunities will be posted on the project website under Suppliers/Subcontractors/Opportunities: http://www.bechtelparsonsbgcapp.com • Prequalification requirements will be listed on the description for the scope of work • All project RFP’s are Invitation to Bid Only. A completion of prequalification process does not guarantee participation in any RFP. • Submit interest and prequalification documents utilizing the e-mail tool (bgbuyer@bechtel.com) by clicking the envelope icon

  11. BGCAPP Project Website

  12. Prequalification Process • Prequalification for Materials and Fabricated Equipment • Work History • Manufacturer Agreements • Certifications-ASME, ISO 9000, Class of Code Stamp • Quality Program • Shop Capacity • Financial Capability • Schedule • References • Prequalification for Subcontracts and Services • Work History • Safety, Experience Modification Rate, OSHA 300 logs • Quality Program • Financial Capability- Bonding & Insurance • Teaming Partners • References

  13. Small Business • Bechtel Parsons Blue Grass (BPBG) is committed to providing meaningful roles for small, small disadvantaged, HUBZone, women-owned, veteran-owned and service disabled veteran-owned businesses • Am I a small business? http://www.sba.gov/size/indextableofsize.html http://www.sba.gov • BPBG strongly encourages partnerships between small businesses and small and large businesses • Identify the role of each partner in your plan • Submit prequalification documents for each partner

  14. Contact Information Diane Osbourne Small Business Program Advocate 301 Highland Park Dr. Richmond, KY 40475 (859) 624-6204 dosbourn@bechtel.com