120 likes | 267 Views
TIARA WP2 Report and wrap-up. Final Annual M eeting R . Aleksan Nov. 27 th , 2013. WP2 Tasks. Main tasks. Define the Governance of TIARA Actual work concentrating on Statutes Management structure Advisory mechanisms & bodies Collaboration with other bodies Financial aspects
E N D
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27th, 2013
WP2 Tasks Main tasks • Define the Governance of TIARA • Actual work concentrating on • Statutes • Management structure • Advisory mechanisms & bodies • Collaboration with other bodies • Financial aspects • Organization of CD&O Subgroup Reports Available report available Meetings • February 18th, 2013 • June 7th, 2013 • October 12nd, 2013 • November 25th, 2013 + subgroup meetings • February 23rd, 2011 • April 4th, 2011 • May 24th, 2011 • October 17th, 2011 • March 2nd, 2012 • June 12th, 2012 • October 31st, 2012 All documents are on WP2 workspace
WP2 Tasks 4 deliverables
TIARA WP2 Objectives WP2 is actively working toward finalizing the remaining documents, enabling to develop the framework for b Creation of a multi-field coordinated panEuropean multi-purpose Distributed Accelerator R&D Infrastructure within an Association (AISBL) allowing us to get supports for developing the programmes that have been discussed during this preparatory phase
Confirmation the great work done The 4 TechnicalWPs are in greatshape • WP6: SVET • Very low emittance achieved at SLS <1pm (world record) • Improved diagnostics being installed a even better ey • WP7: ICTF • Nominal RF amplifier power reached (2MW) @Daresbury • Being installed in ICTF hall @RAL for MICE operation • New DiacrodeAmplifier developed and tested successfully at Los Alamos (3 MW) b Excellent Infrastructure showcase Final WP Reports need to bedone by end 2013 • WP8: HGA • 2 New C-Band structures successfully constructed • Being installed for high power tests on SPARC @LNF • WP9: TIHPAC • Design of Multi-MW test Irradiation Facility completed • Design of the versatile SC Cavity test Cryostat close to completion
Work Status 4 OrganizationalWPs have made impressive progress as well • WP3: Infrastructures • Survey and RI database established • Finalization of the list of Infrastructures being part of TIARA • Needs vs resources comparison and upgrades/ construction of new RI being finalized b Excellent studies highlighting TIARA potential to strengthen Accel. R&D Final WP Reports need to be done by end 2013 • WP4: R&D programme • Key Accel. Research Area and Key Tech. Issues been identified • Final plan of the collaborative R&D Programme being finalized bb • WP5: Education and Training • E&T Survey and resource database established • Survey of Needs for Accel. Scientists done • Recommendations for promoting Accel. Science and Tech. in Europe done • WP2: Governance • Legal statutes of TIARA are being drafted apressure on WP2
Promoting TIARA You canbeproud of the workyou have done • To implement TIARA, important now to do lobbying at all levels • EC level • Funding agency level • Laboratory level • Your colleague level … also with advertising material Important to use them to promote TIARA
Very successful meeting as demonstrated by the great achievements reported … but also as shown by a lots of happy faces
Finally and once again Heartily thanks to Prof. SwapanChattopadhyay and Prof. Susan Smith and Prof. Peter McIntosh for hosting TIARA But also and specially to Sue and Mary for doing all the work!!!
Conclusions The objectives of TIARA are very ambitious and challenging Overall Work is progressing very well, but there is still a lot to do for this endeavor to be successful The last 2 months are vital as we have to come to a concrete proposal for implementation … this NOT the end, and we have still a lot of great things to to all together and your dedication will be essential I wishyou a safe trip back home TIARA willstrengthenfurther Accelerator science; a powerful meantoward scientific, technical and industrial breakthroughs…