Sarasota Memorial Hospital Campus Improvement Plan

Sarasota Memorial Hospital Campus Improvement Plan. Neighborhood Advisory Council October 12, 2010 Construction Update. Project Phasing 1 & 2: Demolish CEP, Pre-Moves, New Garage Entry/Exit. . New CEP Completed. . Information Systems Complete – 5-Service. .

Download Presentation

Sarasota Memorial Hospital Campus Improvement Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council October 12, 2010 Construction Update

  2. Project Phasing 1 & 2: Demolish CEP, Pre-Moves, New Garage Entry/Exit  New CEP Completed  Information Systems Complete – 5-Service  Central Receiving Complete – 1-Waldemere Wound Care – 2-Waldemere  On-Call – 4-Central  Observation Complete – 9-East Surgery/CS Vertical Expansion Interim Moves for Surgery Support & Pathology Temporary ECC Turn-around & Canopy  Temporary Entry/Exit at Waldemere Garage  Demolish Old CEP Temporary Main Entrance Canopy Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. 2 2

  3. Project Phasing 3 & 4: Temporary Drive, Complete Fall 2010 Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. Wound Care – 2-Waldemere Temp Main Entry Turn-around& Canopy On-Call 3-East Surgery/CS Vertical Expansion Moves for Surgery Support & Pathology Complete Demolish Portion of Critical Care Tower Temporary ECC Turn-around & Canopy Complete Sitework & Temporary Drive 3 3

  4. Project Phasing 5: Demolish Northeast Wing and Main Entry, Begin Bridge Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. Temp Main Entry Turn-around & Canopy Demolish Northeast Tower Main Entry Canopy Structure for Bridge, Elevator & Stair Surgery/CS Vertical Expansion ECC Vestibule, Canopy and Drop-off Complete Sitework & Temporary Drive 4 4

  5. Project Phasing 6: Patient Tower Foundations, South Connector Complete Winter 2010 - 2011 New Patient Tower Foundations Structure for Bridge, Elevator & Stair Surgery/CS Vertical Expansion & Connector to So. Garage Legend: Beige box is ongoing. 5 5

  6. Project Phasing 7: Patient Tower Structure, Surgery / CS, New Patient Tower Structure Surgery/CS Vertical Expansion & Connector Complete Legend: Green box means that portion will be completed in that phase. Beige box is ongoing. 6 6