1 / 5

NCC CDR plans

NCC CDR plans. R. Seto. Schedule. CDR Skeleton in CVS (CVS co offline/analysis/NCCCDR) Nov 8 (EK and I talk) Dec ~4 CDR to collaboration EC/DC etc review Jan BNL Review Feb – To Doe Beam Tests – now at Dubna (Vasily/Andrei with Merkin, Litvinenko etc) beam test 9 th to 13th

Download Presentation

NCC CDR plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NCC CDR plans R. Seto

  2. Schedule • CDR • Skeleton in CVS (CVS co offline/analysis/NCCCDR) • Nov 8 (EK and I talk) • Dec ~4 CDR to collaboration • EC/DC etc review • Jan • BNL Review • Feb – To Doe • Beam Tests – now at Dubna (Vasily/Andrei with Merkin, Litvinenko etc) beam test 9th to 13th • Korea Trip Nov 14-18 – EK/RKS

  3. 1. Executive Summary (RKS) 2. Physics Overview (a) Heavy Ion Physics i. Gamma-jet (John L I hope) ii. Chic (Jamie) iii. charm (Jamie) (b) pA collisions and the CGC (Jen-Chieh+R. Seto) i. direct photons ii. dileptons iii. hadrons iv. jets (c) Spin Structure of the nucleon (Mickey - how much?) i. W ii. Delta G Gamma-jet iii. Transversity (d) Nucleon structure (Jen-Chieh) 3. Physics Measurements with the NCC (RKS) (a) Performance i. Pi0 ii. Photons iii. Electrons iv. Jets (b) Physics reach i. Heavy Ion Physics ii. Spin Structure iii. Nucleon Structure (c) Physics reach with the all Upgrades Outline

  4. 4. The design of the NCC (EK) (a) Overview (b) The Calorimeter (c) EM compartment (d) Hadronic compartment (e) Gamma pi0 detector (f) Electronics (g) Mechanics and Cooling (h) Integration (i) Triggering 5. R and D (EK) 6. Project Management and Responsibilities (RKS) (a) Overview (b) Management Structure (c) Responsibilities 7. Budget and Schedule (RKS, EK) (a) Total Estimated Cost (TEC) (b) Contingency Analysis (c) Overhead (d) Budget (e) Fiscal Responsibilitie (f) Schedule 8. Appendices outline (cont)

  5. Folks who have agreed so far to be readers of various sections: Raju Venugopalan (pA - saturation) Ahbay - spin, and pA Ed Kinney - Spin Mark Strickman - nucleon strucutre Atsushi - lots of it (design etc) Matthias - lots of it. Ken - spin writers (with some hope) RKS EK Mickey Jen-Chieh ? John L jamie ? help

More Related