1 / 9

NCC Status

NCC Status. October 9, 2012. Calvin Liang Stephanie Weiss NGAS A&DP. Path Forward to Investigate NCC EDR Issues. Completed In Work Planned. Proposed steps to investigate NCC issue: Collect SVDNB, GDNBO, and IVOBC granules from August 16-17 th , 2012 – Around new moon

glenys
Download Presentation

NCC Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NCC Status October 9, 2012 Calvin Liang Stephanie Weiss NGAS A&DP

  2. Path Forward to Investigate NCC EDR Issues • Completed • In Work • Planned • Proposed steps to investigate NCC issue: • Collect SVDNB, GDNBO, and IVOBC granules from August 16-17th, 2012 – Around new moon • Construct stray light correction lookup table (LUT) from new moon data • Apply stray light correction LUT to new moon granules using NGAS stray light correction algorithm • Determine best functional fit to corrected radiances and account for night glow. (In work right now) • Produce a new GVVSSE/GVVSLE LUT based on the new functional fits. • Remove stray light in problematic granules • Run the latest version of the NCC EDR algorithm in ADL on stray light corrected granules (results are shown using ADL 3.1) • Inspect output to determine whether some of the problems identified in the granules go away with stray light correction • If it is found that fixing stray light does not completely solve the problems, then we will delve into the NCC EDR algorithm logic

  3. Radiance vs Solar Zenith AfterStray Light Correction Straylight removed Noise floor 7e-11 Some overcorrection but very little Current SZA cutoff = 105 C. Liang, NGAS

  4. VNCCO-npp-d20120612-t0012064-e0013407-b03229 For mix solar/lunar conditions, straylight corrected LUT improves image.

  5. VNCCO-npp-d20120612-t0013301-e0015079-b03229 For mix solar/lunar conditions, straylight corrected LUT improves image.

  6. VNCCO-npp-d20120612-t0014555-e0016351-b03229 For mix solar/lunar conditions, straylight corrected LUT improves image.

  7. VNCCO-npp-d20120611-t2357471-e2359320-b03229 Out of bound values (65528) For purely lunar conditions, straylight corrected LUT does not improve image

  8. Summary • For mixed solar and lunar conditions, i.e. when lunar and solar angles are between 0 and 105, the stray light corrected LUT seems to improve the contrast in images • The application of the straylight corrected NCC table does not seem to fix the problem of NCC producing an abundance of “out of bound” values • Will likely need to delve into the code to investigate this further

More Related