WP 5 Logistics and Infrastructure. B2010 - Umeå 20.11.2003. WP 5 – Main goals. Vision: Reinforced cross-border transport and communication systems Strategic focus:
E N D
WP 5Logistics and Infrastructure B2010 - Umeå 20.11.2003
WP 5 – Main goals Vision: Reinforced cross-border transport and communication systems Strategic focus: To develop communication systems and set focus on missing links in the transport infrastructure systems (Physical as well as Digital). Planned results: Improved solutions for communications in the Barents region and identification of missing links and malfunctions in the transport infrastructure system (Physical as well as Digital).
WP 5 – cooperation with STBR • Sustainable Transport in the Barents Region • Linking the management group work between the two projects to avoid overlapping and to guarantee efficient exchange of information between the projects • STBR Management group meeting 2.12.2003, possible place to discuss about work division in between two projects • B2010 FOCUSES ON PRACTICAL WORK RELATED TO LOGISTICAL NEEDS OF COMPANIES
WP 5 – milestone 1 • Survey of facts about the infrastructure and communication system in the Barents region (STBR) • Identification of transport and communication needs for industry and citizens (STBR) • meeting with STBR 2.12.2003 to talk about work division, informing rest of the project about the results of the meeting (Oulu) • listing regionally the logistical needs and central companies and other key players (Oulu to act as a reminder); goods – people – IT-systems; checking it with other WP’s • SWOT-analysis based on the present situation • WP meeting february 2004 – finetuning the budgetary issues
WP 5 – milestone 2 • SWOT-analysis continues… • Covering the holes of fact survey with external expertise • Meetings with other WP’s during spring 2004 • forestry and mining • fisheries • Large network meeting – beginning of June 2004
WP 5 – milestone 3 • Based on the findings of logistical needs starting to discuss about possible common logistical strategy – input to STBR ”What must be done to develop logistics in Barents region” • Meeting according to the time schedule of the whole project schedule, autumn 2004
WP 5 – milestones 4 and 5 • to be decided and clarified during the project, based on the findings from 3 first milestones