An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Drinking Water on Statia No Permanent Sweet Water Sources: • Collecting and Storing Rain water • Wells (Brackish)

  2. Drinking Water on Statia

  3. Drinking Water on Statia

  4. Drinking Water on Statia

  5. Drinking Water on Statia Ave 985 mm/yr

  6. Drinking Water on Statia Concordia

  7. Drinking Water on Statia Mountain

  8. Drinking Water on Statia Golden Rock

  9. Drinking Water on Statia Mountain

  10. Drinking Water on Statia 1993 - “General Assessment Cistern Water St.Eustatius” (IWACO) 1996 - “Masterplan Drinking Water Supply St.Eustatius” (Intecma) 1997 - 1st Project Proposal (DEPOS) Project Proposal Denied Advisary Note (IWACO) 1998 - Design Cost Approved

  11. Drinking Water on Statia 2000 - Tender for Production and Distribution facilities 2000 - 2nd Project Proposal submitted 2001 - 2nd Project Proposal denied 2001 - Project Proposal Temporary Solutions submitted 2001 - Project Proposal Temporary Solutions submitted

  12. Drinking Water on Statia 2004 - Temporary Solution completed and commissioned: • SWRO Water Plant 2x 125 m3/day • 250 m3 storage tank by Plant • 1000 m3 storage tank on elev. 110m (Lodi) • Pressure line to storage tank • 2 water trucks Total investment $ 1.350.000,00

  13. Drinking Water on Statia

  14. Drinking Water on Statia

  15. Drinking Water on Statia

  16. Drinking Water on Statia 2007 - Single Programming Document submitted for 9th EDF 2009 – Preparation tender Documents 2010 - Tender and Contract Awarding for distribution 2011 - Start execution 2013 - Commissioning distribution

  17. Drinking Water on Statia

  18. Drinking Water on Statia • 38 km water lines • 950 house connections • 41 Fire Hydrants • 2 pumping stations

  19. Drinking Water on Statia

  20. Drinking Water on Statia

  21. Drinking Water on Statia

  22. Drinking Water on Statia kunnen kunnen

  23. Drinking Water on Statia For the future: Get the residents hooked on drinking water

More Related