Dubna straws and assembly site status (28/09/2012) Dubna straws - stored - manufactured Assembly site: - module vacuum test results - straw installation tooling test - straw position scanner status Plans Presented by S.Movchan.

zia-larson
Download Presentation

25-Oct-14

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dubna straws and assembly site status (28/09/2012) • Dubna straws • - stored • - manufactured • Assembly site: • - module vacuum testresults • - straw installation tooling test • - straw position scanner status • Plans • Presented by S.Movchan 25-Oct-14 S.Movchan Straw manufacturing and QC 1

  2. Dubna straws Last straw serial number - #2784 For Dubna Module: 418 straws – stored 653straws – manufactured Total: 1071 straws For CERN Module: 506 straws will be delivered to CERN - end of October 25-Oct-14 S.Movchan Straw manufacturing and QC 2

  3. Module vacuum test at Dubna 25-Oct-14 S.Movchan Straw manufacturing and QC 3

  4. Set up for Module vacuum test Sensors r/o Pumps Table He leak detector Table gas leak is about 0.1 mbar/10h (V~0.8 m3, T=23 degree) Leak L = 170 mbar*cm3/min 25-Oct-14 S.Movchan Straw manufacturing and QC 4

  5. Module deformations control Common view 6 micrometers: 4 –> on side + 2 –> on top Elastic deformations are about (60+/-20) μm 25-Oct-14 S.Movchan Straw manufacturing and QC 5

  6. Leak dP=0.7 mbar dT=2964 min V=2200000 cm3 dP/dt=2.36*10-4 mbar/min Leak ~ 520 mbar*cm3/min (video film is available) 25-Oct-14 S.Movchan Straw manufacturing and QC 6

  7. Dubna assembly site 25-Oct-14 S.Movchan Straw manufacturing and QC 7

  8. Module installed – 27 September 2012 25-Oct-14 S.Movchan Straw manufacturing and QC 8

  9. Straw assembly tooling 25-Oct-14 S.Movchan Straw manufacturing and QC 9

  10. Straw installation test Ok! 25-Oct-14 S.Movchan Straw manufacturing and QC 10

  11. Straw position scanner 25-Oct-14 S.Movchan Straw manufacturing and QC 11

  12. Set up (based on INFN equipment) laser in progress … 25-Oct-14 S.Movchan Straw manufacturing and QC 12

  13. Bar for laser Top Middle Bottom 3 laser positions INFN bar with optic ruler 25-Oct-14 13

  14. Main components laser Vertical bar (Y-coordinate) Step motor Horizontal bar (X-coordinate) Movable table 25-Oct-14 S.Movchan Straw manufacturing and QC 14

  15. Plans • October 2012 • Installation and tuning of straw supports - 1 week • Tooling for straw gluing check • Laser scanner preparation • Technology verification: • Step 1 (without gluing): - 1 week • - installation of 14 straws (will be used 1/2 set of tooling) • - measurement position of 14 straws by laser scanner • Step 2: - 1 week • - gluing of 14 straws • - measurement position of 14 straws • November 2012 - 4 weeks • Start straw mass-gluing • December 2012 - 4 weeks • Continue straw gluing 25-Oct-14 S.Movchan Straw manufacturing and QC 15

  16. Conclusion Straws: Straw manufacture rate– 100 straws per week Dubna Module: stored - 418 straws manufactured - 653 straws Delivery 506 straws to CERN – end of October 2012 Dubna assembly site: Module vacuum test: leak L ~ 500 mbar*cm3/min Technology verification - October 2012 Start straw mass-gluing – November 2012 25-Oct-14 S.Movchan Straw manufacturing and QC 16

  17. 25-Oct-14 S.Movchan Straw manufacturing and QC 17