Dubna modules assembly status (December 12 2013) Straw manufacture: CH4 M2 X-Y - 900 straws are ready spare - about 300 pc CH2 M2 X-Y status CH4 M1 U-V status CH4 M1 X-Y status Presented by S.Movchan.

louise
Download Presentation

13-Oct-14

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dubna modules assemblystatus (December 12 2013) • Straw manufacture: • CH4 M2X-Y - 900 straws are ready • spare - about 300 pc • CH2 M2 X-Ystatus • CH4 M1 U-Vstatus • CH4 M1 X-Ystatus • Presented by S.Movchan 13-Oct-14 S.Movchan Straw manufacturing and QC 1

  2. Straws Last straw serial number is #7032 900straws for CH4 M2 X-Y(4-th Dubna module) # (5751-6700) About 300 pс-spare: # (6701 - 7032 ) 13-Oct-14 S.Movchan Straw manufacturing and QC 2

  3. CH2 M2 X-Ystatus 13-Oct-14 S.Movchan Straw manufacturing and QC 3

  4. CH2 M2 X-Y installed for assembly (July 16 2013) 13-Oct-14 Microworld physics, Gomel, 2013 4

  5. CH2 M2 X-Y status: all straws glued (October 14 2013) 8 layers glued 13-Oct-14 S.Movchan Straw manufacturing and QC 5

  6. CH2 M2 X-Y status: wiring finished (December 6 2013) 13-Oct-14 S.Movchan Straw manufacturing and QC 6

  7. CH2 M2 X-Y: WEB reparation 13-Oct-14 S.Movchan Straw manufacturing and QC 7

  8. Covers installation 13-Oct-14 S.Movchan Straw manufacturing and QC 8

  9. Cells gas leak test by differential method Gas leak: Cells (1+2) Cells (3+4) K=1 K= Cells (3+4)/ Cells (1+2) 13-Oct-14 S.Movchan Straw manufacturing and QC 9

  10. CH2 M2 X-Y: plans “Dry” room for HV test • Tests: • cells gas leak test – in progress • HV test – in preparation • Final gas leak test – February 2014 • Delivery to CERN – March -April 2014 13-Oct-14 S.Movchan Straw manufacturing and QC 10

  11. CH4 M1 U-Vstatus 13-Oct-14 S.Movchan Straw manufacturing and QC 11

  12. CH4 M1 U-V: vacuum test (October 2013) Leak < 0.1 cm3/min (requirement L<=0.8 cm3/min) 13-Oct-14 S.Movchan Straw manufacturing and QC 12

  13. CH4 M1 U-V installed for assembly (December 9 2013) 13-Oct-14 S.Movchan Straw manufacturing and QC 13

  14. CH4 M1 U-V: straw gluing (January 27 2014) V: 4 layers glued (January 24) U: 3.5 layers glued (February 10) 13-Oct-14 S.Movchan Straw manufacturing and QC 14

  15. CH4 M1 U-V: plans • Finish of straw gluing – February 14 • V-coor. first gas leak test – February 12 • U-coor. first gas leak test – February 22 • Wiring – end of February • Gas manifold installation - March 10 • Final gas leak test – March 25 • Delivery to CERN – March-April 2014 13-Oct-14 S.Movchan Straw manufacturing and QC 15

  16. CH4 M2 X-Y 13-Oct-14 S.Movchan Straw manufacturing and QC 16

  17. CH4 M2 X-Y: vacuum test preparation 13-Oct-14 S.Movchan Straw manufacturing and QC 17

  18. Test result #7 (January 27 2014): zoom Module P (mBar) dP= 0.16 mBar, dT=4000 min Time scale: 3050-4050 min Module T (degree) dT= -1.2 degree Atm P (mBar) dP= -1.2mBar 13-Oct-14 S.Movchan Straw manufacturing and QC 18

  19. Test result #7,CH4 M2 X-Y vacuum leak estimation: Leak estimation for final time interval dT=(3050-4050) min: Time: dt = 4000 min (time scale: 3050 -> 4050 min) Room temperature: dT= - 0.25 degree (24.85 -> 24.6 degree) Atmospheric pressure: dP= -1.2 mBar (1018.8 -> 1017.6 mBar) Vacuum pressure drop: dP= 0.16 mBar (0 -> 0.16 mBar) Vacuum pressure drop dP =0.16 mBar and dT=4000 min Volume V=2.2x10**6 cm3 Gas leak estimation: L = dP/P * V/dT <= 0.09 cm3/min (Requirement: L ≤ 0.8 cm3/min) OK! 13-Oct-14 S.Movchan Straw manufacturing and QC 19

  20. CH4 M2 X-Y: schedule • Module frame gluing (January 2014) - done • Vacuum test (February 2014) - done • Straw gluing – March-April 2014 • Wiring – May 2014 • HV test – May 2014 • Gas manifold installation – May-June 2014 • Final gas leak test – June 2014 • Delivery to CERN – end of June 2014 13-Oct-14 S.Movchan Straw manufacturing and QC 20

  21. Conclusion • Straw manufacture: • 900 straws are for CH4 M2 X-Y • about 300 straws - spare • CH2 M1 U-V: • delivery to CERN – November 2 2013 • HV test and gas leak test at CERN - done • CH2 M2 X-Y: • final tests (HV, gas leak) – February-March 2014 • delivery to CERN – March-April 2014 • CH4 M1 U-V: • - wiring – end of February 2014 • - final gas leak test – March 25 2014 • - delivery to CERN – March-April 2014 • CH4 M2 X-Y: • - straw gluing – March-April 2014 • - wiring - May 2014 • - final tests (HV, gas leak) – May-June 2014 • - delivery to CERN – end of June 2014 13-Oct-14 S.Movchan Straw manufacturing and QC

  22. 13-Oct-14 S.Movchan Straw manufacturing and QC 22