Status of the FMD. LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr Institute. Prototype status. Hamamatsu sensor prototype: well within specs → Inner production started, delivery end November → Outer design done, prototype ordered IDEAS inner hybrid prototype:
E N D
Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr Institute Børge Svane Nielsen, NBI
Prototype status Hamamatsu sensor prototype: well within specs → Inner production started, delivery end November → Outer design done, prototype ordered IDEAS inner hybrid prototype: VA1_3 chips within specs, all produced → 2nd hybrid prototype delivered and tested → Hybrid production starting Prototype module (sandwich) status: MIP particles seen (680 MeV e-) Noise level as expected or better → 2nd prototype tested in e- beam early October Readout electronics status: →Prototype VA1-Digitizer-RCU chain working Mechanics: →TPC-ITS-T0-V0-FMD assembly test done Børge Svane Nielsen, NBI
Silicon sensors Inner prototype: 300 μm thick 2 x 512 strips 250 μm pitch Leakage current (specs < 3 μA) Bonding pads 300 nA Bias voltage 300 V Detector capacitance 13cm 2 nF 300 V Bias voltage Bonding pads Børge Svane Nielsen, NBI
Prototype module • 3 prototype inner detector sandwich modules built: Hybrids glued to sensors with thin ceramic spacers Readout pads bonded to silicon at periphery of hybrid bonds hybrid sensor Børge Svane Nielsen, NBI
Beam test of modules 680 MeV e- beam test at ASTRID ring at Aarhus University, DK FMD module e- beam Børge Svane Nielsen, NBI
Noise estimate Inner sensor noise estimate Børge Svane Nielsen, NBI
Test beam results, July • Tested prototype with high energy electron beam (680 MeV) • Clear signal peak • Signal/Noise 60 Børge Svane Nielsen, NBI
Test beam results, October S/N=56 S/N=47 S/N=58 S/N=56 Børge Svane Nielsen, NBI
Read-out electronics Lab test with sandwich and prototype Digitizer+RCU readout RCU • Good progress with prototype • Digitizer and USB version of RCU • prototype Digitizer card + firmware built • complete Digitizer+RCU chain works • first beam tests with full electronics chain successfull • preparing for final version Digitizer Børge Svane Nielsen, NBI
Integration test Installation of FMD3 and FMD2 together with ITS, etc. Beam pipe support Børge Svane Nielsen, NBI
Conclusions • FMD prototype modules show excellent signal to noise characteristics ( 60:1). • Hit sharing accounts for most of the particles seen between the MIP peak and the noise peak. • Production of inner sensors and hybrids started. • Final design of outer module, digitizer and mechanics progressing well. Børge Svane Nielsen, NBI