South Kona Flood Hazard Study Public Information Meetings January 23-24 , 2008 Steve Yamamoto USACE, Honolulu. County of Hawaii. Purpose. Discuss Corps of Engineers’ study authority Provide information and status on the South Kona Flood Hazard Study
E N D
South KonaFlood Hazard StudyPublic Information MeetingsJanuary 23-24, 2008Steve YamamotoUSACE, Honolulu County of Hawaii
Purpose • Discuss Corps of Engineers’ study authority • Provide information and status on the South Kona Flood Hazard Study • Discuss study area, methodology and products • Gather input from community
Study Authority Authority: Section 206 of the Flood Control Act of 1960, as amended (Flood Plain Management Services Program) Purpose: To encourage prudent use of the Nation’s flood plains for the benefit of the national economy and general welfare by supporting comprehensive flood plain management at all governmental levels.
FPMS Program • TECHNICAL SERVICES • Obtain, develop or interpret flood plain data which includes: • providing historical data on flooding • establishing flood frequency • determining flood stage
FPMS Program • TECHNICAL SERVICES (cont.) • determining extent of flood plains • establishing regulatory floodways • providing site specific flood hazard evaluations • inventory of flood prone structures • post flood studies
South Kona Flooding • Historical Floods • March 1956 8-12 inches in 3-hr period • April 1963 4 inches in 2 hours • Nov 1967 4 inches in 2 ½ hrs • May 1976 5 inches in 4 hours • Nov 2007 7 ½ inches in 4 hours
South Kona Flood StudyScope of Work • Collect lidar topographic survey data for 142 sq. mi. • Gather flood information at public meetings • Conduct hydrologic and hydraulic analyses to determine flood hazards within the study area • Prepare report and flood maps documenting study results • Process maps for FEMA FIRM revisions
South Kona Flood StudySchedule • Current Study Schedule • Execute Study Agreement June 2007 • Award Lidar Topographic Contract Sept 2007 • Award Floodplain Hydraulics Contract Jan 2008 • Conduct initial public meeting Jan 2008 • Complete Draft report and flood maps Sept 2008 • Conduct second public meeting Oct 2008 • Complete Final report and flood maps and submit results to FEMA Nov 2008
Points of Contact • Steven Yamamoto, USACE, Project Manager • 438-0881 • Steven.H.Yamamoto@usace.army.mil • Milton Yoshimoto, USACE, Project Manager • 438-2250 • Milton.T.Yoshimoto@usace.army.mil • Jeff Overton, Group 70, Chief Environmental Planner • 523-5866 • Massoud Rezakani, MRC, Principal • 480 656-2304 • Galen Kuba, Chief of Engineering Div, County of Hawaii DPW • 961 8422