1 / 6

3GPP2 Steering Committee TSG-A report

3GPP2 Steering Committee TSG-A report. Vancouver, BC, Canada January 28, 2000. TSG-A status report. Release A deliverables: IOS V4.0 completed and released as of January 18, 2000 (Document A.S-0001) - V&V version was available since November 5th, 1999

zorion
Download Presentation

3GPP2 Steering Committee TSG-A report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3GPP2 Steering CommitteeTSG-A report Vancouver, BC, Canada January 28, 2000 3GPP2 report

  2. TSG-A status report • Release A deliverables: • IOS V4.0 completed and released as of January 18, 2000 (Document A.S-0001) - V&V version was available since November 5th, 1999 • Tandem Free Operation specification completed as of January 18, 2000 (Document A.S-0004) • Abis Technical Report completed and released as of December 17, 1999 (Document A.R-0003) • SDOs will process ballot comments for V4.0 or TFO • could result in technical changes to the core part (I.e. not regional requirements), but only in case of technical bugs or errors • SDO changes will be included in next revision or release of the specification • same procedure could be used in all TSGs 3GPP2 report

  3. IOS V4.1 • Definition: • Point release to support proposal from carriers and CDG • Supports top priority air interface Release A features • Includes other network features (e.g. packet data improvements) • Required for Japan’s 3G licenses • Dates: • No consensus on the dates for V4.1 • Carriers strongly wish to have the baseline for IOS V4.1 completed in April 2000. • Vendors do not believe this is achievable • Status: • Planning work has nevertheless started in the January meeting • Carriers are project managing and bringing contributions • Champions assigned and technical impacts identified 3GPP2 report

  4. TSG-A 2000 work plan • IOS V4.1: • Target freezing date = April 2000 • Target release date = June 2000 • Abis Technical Specification: • Target freezing date - March 2000 • Target release date = June 2000 • IOS V5: • Target freezing date = December 2000 • Target release date = February 2001 • TFO enhancements: • Target freezing date = December 2000 • Target release date = February 2001 3GPP2 report

  5. TSG release synchronization • Release A Technical Specifications do not support same features • no end to end support • puts carriers relying on interoperability at a disadvantage • TSG-A would like to request stronger coordination, especially with TSG-C in order to synchronize TSG-A’s Technical Specification with TSG-Cs • A yearly release process is proposed • synchronized with other TSGs work plan • For example, there could be a maximum delay of three months behind air interface standards 3GPP2 report

  6. All IP work • TSG-A feels it is important they are involved in the All IP work: • TSG-A has the expertise on Access Network Interfaces as well as on IP mobility (A8 - A11 interfaces) • Discussions and work have already started on IP interfaces within the Access Network as part of the IOS V5 work plan • TSG-A re-iterates their commitment to participate in this effort • TSG-A endorses the decision of the TSG-S All IP ad hoc but is concerned about the dates: • the February meeting conflicts with TSG-A Hawaii meeting - TSG-A will nevertheless have some participation and contribution • the second meeting is inconvenient: propose to move to the beginning of the March 20 week in Japan • We assume that the third meeting in Seattle will take place in the week of April 10 - TSG-A has no problem with this date and place 3GPP2 report

More Related