1 / 14

AN BINH ELECTRIFICATION PROJECT

AN BINH ELECTRIFICATION PROJECT. WIND & SOLAR PROJECT PRESENTATION November 2012. Content. Overviews The Pre-investment phase of Project The PILOT Phase – project. Overview -Project Location. In An Binh islet, Ly Son Island District, Quang Ngai Province, Vietnam. An Binh islet.

zorion
Download Presentation

AN BINH ELECTRIFICATION PROJECT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AN BINH ELECTRIFICATION PROJECT WIND & SOLAR PROJECT PRESENTATION November 2012

  2. Content • Overviews • The Pre-investment phase of Project • The PILOT Phase – project

  3. Overview -Project Location • In An Binh islet, Ly Son Island District, Quang Ngai Province, Vietnam An Binhislet Quang Ngai province An Binh commune

  4. Project highlights

  5. Stakeholders • Project beneficiaries: • 500 inhabitants in An Binh islet • Project partners: • Golden Bridge • Institute of Energy of Vietnam (IEV) • Department of Industry and Trade (DoIT) of Quang Ngai Province.

  6. Compliancewith Main National Policies • Promotion of renewable energy (Vietnam National Energy Development Strategy until 2020, with a vision towards 2050) • Electrification: 100% of households enjoying an electricity supply towards 2020 (Master plan VII) • Poverty reduction (Socio-economic development program for communes with especially difficult conditions, Decree 108-2006-ND-CP)

  7. PROJECT IMPACTS A project with strong local impacts on: • Living standard • Education • Healthcare • Public services • Local economic development • Presently, inhabitants of An Binh islet have no electricity. • Replicability of the project models to nearby areas (Lý Sơn iland, and other unelectrified areas…)

  8. Project objectives • Feasibility Study and Action plan for setting up a RE – Based Hybrid Electrification System (solar and wind) • To supply electricity to all of more than 100 households (about 500 people) • in a remote, off-grid, and poor area

  9. Project Outcomes • EEP Mekong Program support cover the pre-investment stage: • Data collection, measurements • Feasibility study • Project achievements: • FS Approval on 18th July, 2012 • Action plan to further develop the project (stakeholder meetings, development strategy, fundraising proposal for Pilot phase).

  10. A pilot Project: implementation • A pilot project • Sustainability • Replicability & dissemination Project implementation – 10 months EEP Mekong 3-V-020 project October 2011 – September 2012

  11. Pilot phase: PROJECT hightlights

  12. Pilot phase- Aim of the project • Installing a RE-Based Hybrid Elecfication System (Solar and Wind) • To supply electricity to all inhabitants of An Binh islet (Remote, off-grid, and poor area) • By ensuring sustainable low cost of electricity. • To set up an ESCO model – replicatedby similar islands that have no or limited electricity supply to ensure O&M for sustainable operation of the system

  13. Pilot project Implementation- Scope Equipments: • One 10kW wind power turbine, • 96 solar panels, • diesel generators, • Batteries • A 220V distribution line Steps to be conducted: • Land clearance • Purchase of equipments, • Installation • Testing • Commissioning • Training

  14. THANK YOU Questions & Answers

More Related