1 / 44

Lee County 2012 – 2021 Transit Development Plan

Lee County 2012 – 2021 Transit Development Plan. Presentation Overview. What is the TDP? Existing service levels Public outreach Situation appraisal 2021 Needs Plan. What is the TDP?. FDOT requirement 10-year plan Strategic plan for transit service

zorion
Download Presentation

Lee County 2012 – 2021 Transit Development Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lee County 2012 – 2021 Transit Development Plan

  2. Presentation Overview What is the TDP? Existing service levels Public outreach Situation appraisal 2021 Needs Plan

  3. What is the TDP? • FDOT requirement • 10-year plan • Strategic plan for transit service • Evaluation of demographic and travel behavior characteristics • Assessment of existing transit service • Public involvement and outreach efforts • Determination of transportation needs • Service and implementation plan development

  4. What is the TDP? • Difference from prior TDP efforts • Development of a 25-year vision • Expanded public outreach

  5. Existing Service Levels Passenger Trips per Revenue Hour Trend

  6. Existing Service Levels Operating Expense per Passenger Trip Trend *Operating expenses were deflated to 2005 dollars to reflect actual trend variation.

  7. LeeTran Trends % Change (2005 – 2009) Summary of Trends • Strengths • Passenger trips per revenue hour: (+) 4.3% • Farebox recovery: (+) 6.7% • Average fare: (+) 24.1% • Challenges • Operating expense per revenue hour: (+) 5.8% • Average age of fleet: (+) 46.0%

  8. Peer Review Peer Selection Process • Service area population • Service area size • Population density • Operating expense • Revenue miles • Passenger trips • Average speed • Peak vehicles National Transit Database (NTD) Southeastern United States (12 States) Peer selection variables:

  9. Peer Review County of Volusia (Votran) Sarasota County Area Transit (SCAT) Chatham Area Transit Authority (CAT) Capital Transportation Corporation (CATS) Chattanooga Area Regional Transportation Authority (CARTA) Lexington Transit Authority (LexTran)

  10. LeeTran Peer Review (2009) Passenger Trips per Revenue Hour

  11. LeeTran Peer Review (2009) Operating Expense per Passenger Trip

  12. LeeTran Peer Review (2009) Summary of Peer Review • Strengths • Operating expense per revenue mile: (-) 8.7% • Average fare: (+) 12.2% • Challenges • Passenger trips: (-) 12.9% • Passenger trips per revenue mile: (-) 30.6% • Operating expense per passenger trip: (+) 22.0% • Average age of fleet: (+) 27.7% % indicates LeeTran’s deviation from the peer group average

  13. Public Involvement Expanded Public Outreach Community group presentations (5) Public workshops (4) Discussion group workshops (6) Stakeholder interviews (19) On-board survey LeeTran operator interview and survey

  14. Community & Discussion Groups • Discussion Groups • LeeTran bus users • Students • Social service agency representatives • Business/medical/education industry representatives • Transportation planning agencies • County departments • Community Groups • Bike/Walk Lee • Community Sustainability Advisory Committee • Reconnecting Lee • Horizon Council • Transit Task Force

  15. Public Workshops • January and July 2011 • Top three improvements • More benches and shelters at bus stops • Later service on existing routes • More frequent service on existing routes

  16. On-Board Survey Customer Satisfaction Levels

  17. On-Board Survey Trip Purpose

  18. On-Board Survey Reasons for Using LeeTran

  19. On-Board Survey Service Improvements

  20. Operator Interview and Survey • Operator concerns include: • Improving poor connectivity/timing • Providing more frequent service during peak periods • Expanding service in Lehigh Acres, Cape Coral, and to surrounding counties • Improving capital infrastructure and equipment

  21. Situation Appraisal • Appraisal of changes in: • Transit markets • County demographics • Local policies • Other relevant issues • Demand assessment

  22. Situation Appraisal • Peer review/Trend analysis • Trends: Flat/stagnant ridership levels • Peer Review: Less ridership per unit of service supplied • Land use • Coordination with local efforts • Integrate transit infrastructure

  23. Situation Appraisal • Technology/Capital Needs • Replacement of older vehicles • Improved station infrastructure • New administrative and operations facility • Funding • Funding limited/constrained • Difficulty in securing new funding sources

  24. Situation Appraisal • Service Needs (2012 – 2021) • Improvements to existing service • More weekend and evening service • Efficiency improvements • Service expansion • New local service (10 routes) • Express bus service with park and ride (4 routes) • Bus Rapid Transit (1 route by 2021)

  25. 2021 TDP Needs Plan 2021 TDP Needs Plan Improved Local Service New Local Service Express Service BRT

  26. Financial Plan – Operating 10-Year Costs: $280.7 million 10-Year Revenues: $213.3 million

  27. Financial Plan – Operating 10-Year Shortfall $67.4 million

  28. Financial Plan – Capital 10-Year Costs: $103.2 million 10-Year Revenues: $56.1 million

  29. Financial Plan – Capital 10-Year Shortfall $47.1 million

  30. Financial Plan – Total 10-Year Costs: $383.9 million 10-Year Revenues: $269.4 million

  31. Financial Plan – Total 10-Year Shortfall $115 million

  32. Cost Feasible Plan • Operations • COA efficiency improvements • Central Fort Myers Circulator (Route 5) • Lehigh Circulator • Collier Connector (LinC) • Capital • Administration facility • Park-and-ride improvements • Bus stop infrastructure • Vehicle replacement

  33. Cost Feasible Plan

  34. 10-Year TDP Priorities • Operations • Maximize existing service efficiency and resource utilization • Implement high-frequency premium bus service along US 41 • Implement new fixed-bus routes • Implement inter-county bus service • Continue expansion of marketing efforts/program

  35. 10-Year TDP Priorities • Capital • Replace aging vehicle fleet with hybrids/”green” vehicles • Improve stop amenities and infrastructure • Construct new administration and operations facility

  36. Comments & Questions

  37. UPDATE ON TRANSIT TASK FORCE AND THEIR RECOMMENDATIONS

  38. Transit Task Force Responsibilities • Make a recommendation to BOCC on future scope of transit services • Deal with existing funding shortfall • Determine best funding option for future transit needs

  39. Transit Task Force Progress • Begun in late 2010 • Reviewed COA • Recommended its adoption • Per BOCC request, split COA recommendations into cost saving and cost increasing modifications • To assist in meeting budget, recommended cost saving changes be implemented in October, cost increasing services in January

  40. Transit Task Force Progress • Ways to fund LeeTran Capital and Operating Costs • 1/2 cent sales tax increase • Create a Municipal Service Benefit Unit (MSBU) • Create a Municipal Service Taxing Unit (MSTU) • Dedicate portion of existing property taxes to transit • Raise property tax rate and dedicate to transit • Make LeeTran a Transit Authority

  41. Transit Task Force Funding Issues • Hold referendum on ½ cent sales tax • How to garner political and public support • Who leads effort for voter approval? • Create MSBU • How close to routes do property owners need to be to derive benefit • Do we use sliding scale based on distance? • Flat fee per property versus valuation approach; 50%+1

  42. Transit Task Force Funding Issues • Create MSTU • Millage based and some localities are approaching millage limit • How are boundaries drawn • Dedicate portion of existing property taxes to transit • Is there political and citizen support • Transit still subject to year-to year approval by BOCC

  43. Transit Task Force Funding Issues • Increase property taxes and dedicate to transit (to fund needs plan tax would equate to $30-$64/$100,000 value) • Is there a will and a way without political suicide? • Make LeeTran a Transit Authority • Will other localities participate • If not, what do we do with service in those areas • Redundant bureaucracy

  44. Comments & Questions Wayne and I will entertain any questions, thoughts or lead a discussion on the COA, TDP or Task Force. FIRE AWAY!!