20 likes | 131 Views
FT Status and Plans. Overall CTS Used to test VRBC boards Qualified several AFE boards Lots of changes made to VRBC’s Current status 50 >> old VRBC, new firmware 51 >> old VRBC, new firmware 52 >> new VRBC, new firmware 53 >> new VRBC, new firmware AFE board swap
E N D
FT Status and Plans • Overall • CTS • Used to test VRBC boards • Qualified several AFE boards • Lots of changes made to VRBC’s • Current status • 50 >> old VRBC, new firmware • 51 >> old VRBC, new firmware • 52 >> new VRBC, new firmware • 53 >> new VRBC, new firmware • AFE board swap • Installed CFT board in FPD • Worked on CFT and FPS boards 3 June 2003
July Shutdown • General items being considered • Cryostat work • About 1 degK left in setting • Have been moving about 0.1 • Will not warm up “unless” have further problems • Cassette work • Only if we warm up • Perhaps install ‘testing’ cassette • Will do • Pull and modify ALL AFE boards • Unused channel fix for AFE brds • 53MHz readout • Check/calibrate/fix AFE lvps monitoring • Add SEQ crate monitoring • Finish LED pulser boards and cabling • New firmware • Fix slot problems – AFE & SEQ • 4B6 SVX Downloads • 6B2/3 SEQ signals @ SEQ BP • May do • AC remote shutoff for AFE lvps • Re-cable back of SEQ crate PC04 • Will not do • CPS • FPS • CTT • FPD Starts ~Aug 28 >> 7 weeks 3 June 2003