An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FT Status and Plans • Overall • CTS • Worked to get CTS back on line • Slots A4-7 have problems • Had to work on SBC • Don L. is continuing tests with new VRBC and VRB firmware at CTS • L1 Deadtime – Extra Data in readout • Put 470KOhm 0402 resistors on un-used channels • 8 per MCM, 64 per board • Verify << in process now • Board ready for platform • Set up modification line • Access AFE board swap • CFT • Replaced 9A5 >> dip at X2 • Replaced 7A4 • Inductors to look at double peds • CPS • Re-programmed CPSS personality • FPS • CTT 6 Mayl 2003

  2. July Shutdown • General items being considered • Cryostat work • About 1 degK left in setting • Have been moving about 0.1 • Will not warm up “unless” have further problems • Cassette work • Only if we warm up • Perhaps install ‘testing’ cassette • Will do • Unused channel fix for AFE brds • Check/calibrate/fix AFE lvps monitoring • Add SEQ crate monitoring • Finish LED pulser boards and cabling • New firmware • Fix slot problems – AFE & SEQ • 4B6 SVX Downloads • 6B2/3 SEQ signals @ SEQ BP • May do • AC remote shutoff for AFE lvps • 53MHz readout • Re-cable back of SEQ crate PC04 • Will not do • CPS • FPS • CTT • FPD Starts ~July 28 >> 4 to 6 weeks 6 Mayl 2003

  3. July Shutdown 2 • Details • How long to do? • Who can work on? • When can it be done? Starts ~July 28 >> 4 to 6 weeks 6 Mayl 2003

  4. Merge Shifts • Management has scheduled a merger of CFT and SMT shifts • Would start after shutdown • after MUON and CAL merge • Should be merged by end June • Can the shifts be merged • Reduce the amount of work the CFT shifter does • Increase effectiveness per minute of attention • Improve and condense the documentation • How are shifts merged • Need people from both groups with cross knowledge • Need a small core of people to get it done 6 Mayl 2003