Naches River Water Treatment Plant Screen Project. Why did the City install a Screen?. September 13, 2006 David Brown Water/Irrigation Division Manager. Naches River Water Treatment Plant Screen Project. Water Treatment Plant and Intake Structure built in 1969 – 1970
E N D
Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager
Naches River Water Treatment Plant Screen Project • Water Treatment Plant and Intake Structure built in 1969 – 1970 • Moved to present location from Oak Flats • Plant put on line in 1972 • Idea was that water supply for the WTP would be from PP&L’s Wapatox Canal • Town of Naches Waste Water Effluent would be bypassed • Fish and debris screening done at Wapatox Canal diversion
Naches River Water Treatment Plant Screen Project • As the issue of returning fish surfaced • John Easterbrook was instrumental in the installation of upstream barriers
Naches River Water Treatment Plant Screen Project • The City’s WTP diversion was not addressed during Phase 1 of the BPA Screening • Wapatox had installed state of the art screens
Naches River Water Treatment Plant Screen Project • Bureau of Reclamation and PP&L started conservations about shutting down the Wapatox • Looked like the canal would be down during the winter months • The City would need fish screens as water would no longer be screened by Wapatox
Naches River Water Treatment Plant Screen Project • The City applied to BPA for funds • BPA grant for partial funding • The City applied to SRFB for funding • SRFB made small grant • Total Project cost $1,838,430 • $1,124,000 from BPA • $300,000 from SRFB • $414,430 from City funds
Naches River Water Treatment Plant Screen Project • Main Structure built by a contractor • Chuck Lenberg and crew built and installed the screens and upstream barriers
Issues • Mud Behind Screens • Long way to run vacuum truck, but doable • Algal build up on screens in summer • Thought we could hand clean twice a year. Before Wapatox turns on and after they shut down • This year with the HOT we have had to hand clean about twice a month • Takes about an hour
Issues • Slush Ice
Naches River Water Treatment Plant Screen Project • Why did the City install a Screen? Tour this afternoon Questions? September 13, 2006 David Brown Water/Irrigation Division Manager