1 / 16

LPF Science Ground Segment

LPF Science Ground Segment. Paul McNamara LTP Data Analysis Meeting 19/20 February 2007. Summary. Introduction Operations Mission Timeline Ground Segment Overview Science Ops Ground Segment. Introduction . Missions within ESA have two “sides” Project (SCI-P) Science (SCI-S)

Angelica
Download Presentation

LPF Science Ground Segment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LPF Science Ground Segment Paul McNamara LTP Data Analysis Meeting 19/20 February 2007

  2. Summary • Introduction • Operations Mission Timeline • Ground Segment Overview • Science Ops Ground Segment

  3. Introduction • Missions within ESA have two “sides” • Project (SCI-P) • Science (SCI-S) • SCI-P manages the project up to, and through, on-orbit commissioning • SCI-S takes control of the mission after commissioning, i.e. when instrument enters Science Phase • LPF Science Operations will be run through the Science and Technology Operations Center (STOC) • This will be managed by the Mission Manager/Project Scientist • The STOC is part of RSSD within ESA, and located at ESAC, Spain • Mission Operations (s/c health and safety, ground stations etc) are managed by ESOC

  4. Operations Mission Timeline T = L + 0 L + 16d L + 50d L + 66d L + 94d L + 184d L + 244d LTP Ops DRS Ops ??? Despin Orbit Corr IOOP SCIENCE OPERATIONS Transfer Phase Commiss- ioning LEOP Launch Separation Project STOC LEOP = Launch and Early Orbit Phase (apogee raising) IOOP = In-Orbit Operational Phase (Science Operations)

  5. Ground Segment Overview • The LPF Ground Segment consists of 3 parts: • The Operational Ground Segment (OGS) • The Science Ground Segment (SGS) • The interface to the Satellite Prime Contractor (Astrium UK) • The major tasks of the OGS is to perform satellite (payload and s/c) operations ensuring safety of the mission. It comprises: • The Ground Stations • The Mission Operations Centre (MOC) at ESOC • The Operational Ground Segment details can be found in the Ground Segment Management Plan (S2-EST-PL-5101)

  6. Interface with Prime (ASU) • The Prime Contractor will interface with LPF to: • Provide OGS, during Phase C/D, the required deliveries called for in the MIP • e.g. Satellite User Manual (SUM) • Support system validation and listen-in tests as required • Provide the SGS, during Phase C/D, with the required deliveries and specialist support concerning the DFACS • Provide Support during launch and satellite (s/c and payload) commissioning • Receive On-Board Software (OBSW) maintenance requests from MOC and/or STOC and provide MOC with end-to-end validated images/patches/ On-Board Control Procedures (OBCPs) to be uploaded to the satellite.

  7. Science Ground Segment • The major task of the SGS is to plan the utilisation and related configuration of the technology instruments on-board LPF, and derive from the mission products the science and technology results. • The SGS consists: • The Science and Technology Operations Centre (STOC) • Establish and maintain the Experiment Master Plan (EMP) • Derive from the EMP the run procedures • Perform monitoring of the technology instruments and DFACS during all phases of the mission • Perform Quick-look data analysis of the ICE telemetry • Perform full data analysis to extract science and technology results • Update TC parameters • Instigate branching of EMP in event of unexpected result • Archive all available data for later availability (i.e. as reference for LISA) • The LTP Contributors

  8. Science Operations Ground Segment Ground Stations LISA Pathfinder Mission Operations Centre (LPF MOC) -OBSM -OBCP Firewall Mission Operations Center / DDS/ MUST (ESOC) • - Mission planning • requests • Short and long term planning requests • -Updated • TC parameter Firewall • Raw HK and s/c TM • Processed HK TM • -Command timeline • -Auxiliary data • DRS specific TM • LTP raw data O/B S/W change requests STOC (Incl Archive) LPF Prime Contractor -Mission planning requests -Mission planning requests LTP Co-Is DRS Raw and engineering payload and s/c data Raw and engineering payload and s/c data Internet

  9. Science Ground Segment • STOC, LTP Contributors and the DRS can have access to data directly from ESOC • Only authorised data is available to each user • i.e. DRS will not have access to all LTP data • However, plan is for all users to access data through STOC • STOC will provide data in Engineering values • STOC provides single point of contact between Science Community and the MOC • Data analysis tools will be run within the STOC • One set of tools will be treated as the Golden Standard • STOC tools will be under Configuration Control • LTP Contributors are at liberty (encouraged) to analyse the data, either with own tool set, or using a copy of the STOC tools. • Data analysis algorithms must be verified prior to launch

  10. Science Ground Segment • Experimental Master Plan written by STOC with input from Science Team • Will be extended to include details of specific procedures (i.e. discharging of proof mass) • Industrial Procedures will be written by Astrium • The building blocks of the experimental runs • Run Procedures written by LTP Team and validated by STOC with LTP/LPF simulator • Satellite database compiled by Astrium UK • Telecommands will be generated and validated by ESOC • Run procedure will look something like D1[t1s,x1W, y1s], D2[t2s,x2W, y2s], T1[t3,23o], ……

  11. Run Procedure Validation

  12. Example of Industrial Procedures

  13. Location of STOC • STOC is being developed in ESAC, Madrid • During s/c commissioning and nominal operations, STOC will relocate to ESOC, Darmstadt • Allows faster access to mission planners, Satellite Operations Manager (SOM), etc • Nominal operations being treated as a payload commissioning phase • After nominal ops (during station keeping), STOC relocates back to ESAC! • ALL further science operations (DRS and extended mission) will be run from ESAC

  14. Science Ground Segment • Science Ground Segment described in more detail in the Science Operations Scenario Document (S2-EST-PL-5005), Science Implementation Plan (LPF-PL-ESAC-DT-001), and Science Ground Segment Design Description (LPF-ESAC-DT-002) • Science Operations Ground Segment to be fully setup by GS-DPDR (2nd Quarter 2007)

  15. LTP Contributors Role • During development, the LTP Contributors (LTP-C) will be involved in defining the procedures for the hardware they have developed and built • The LPF Science Team will also be involved in the creation of the Experiment Master Plan • During operations, the LTP-C are required to support the commissioning of their hardware (as defined in the MLA) • The LTP-C will also be involved in the analysis and particularly the interpretation of the data

  16. DA Website

More Related