1 / 14

12 April 2011

Briefing on Application for Lotteries Fund (LF) for Subvented Residential Care Homes for Persons with Disabilities (RCHDs) to Undertake Fire Safety (FS) / Building Safety (BS) Rectification Measures (Second Phase). Social Welfare Department. 12 April 2011. Operating Parameters.

Audrey
Download Presentation

12 April 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Briefing on Application for Lotteries Fund (LF) for Subvented Residential Care Homes for Persons with Disabilities (RCHDs) to Undertake Fire Safety (FS) / Building Safety (BS) Rectification Measures(Second Phase) Social Welfare Department 12 April 2011

  2. Operating Parameters • The rectification measures to be carried out should comply with and be confined to the prevailing FS / BS requirements for subvented RCHDs. • To uphold the principle of cost effectiveness, the cost for items which are not compliant with FS / BS requirements and the cost for above standard provision will not be recognized.

  3. Operating Parameters • NGOs who have submitted major renovation applications to the LF with their applications still under processing are required to incorporate the required FS / BS rectification measures in their major renovation applications, and these applications are dealt with in accordance with the normal procedures of processing major renovation applications.

  4. Operating Parameters • For those NGOs who wish to carry out major renovations at the same time of the FS / BS rectification measures, they should submit separate LF applications for major renovation under the normal major grant procedures as the scope of this exercise is confined to the FS / BS rectification measures.

  5. Operating Parameters • All successful applicants are required to undertake that no abortive works on the approved FS / BS rectification measures should arise in the event of their subsequent decision on any alteration works to the premises in the next 5 years from the completion of the FS / BS rectification measures.

  6. Operating Parameters • The NGOs should complete the FS / BS rectification measures in accordance with the scope of works and drawings as agreed with the Social Welfare Department.

  7. Application Form Information Required in Application Form • Brief description of the applying service unit • Name of agency, service unit, address, contact person, telephone no., email address, fax no. etc. • Renovation record since 2006 • Time of completion of renovation works, amount of grant received from the LF & brief description on nature of works carried out. • Summary of the application • Total amount requested for FS/ BS works items & attachment.

  8. Application Form Information Required in Application Form Documents to be attached • Four sets of proposed final layout plans drawn to a suitable scale (1:50 or 1:100) in metric unit with all the principal dimensions of the premises and proposed works highlighted • Four sets of existing layout plans drawn to a suitable scale (1:50 or 1:100) in metric unit with all the principal dimensions of the premises

  9. Application Form Information Required in Application Form Documents to be attached (Con’t) • Four sets of detailed list of scope of works (fire safety and building safety rectification measures only) at Appendix 1 & 2 in hard copy • Two sets of detailed list of scope of works (fire safety and building safety rectification measures only) at Appendix 1 & 2 in soft copy (Excel)

  10. Application Form Information Required in Application Form Documents to be attached (Con’t) • Four sets of ‘approval-in-principle’ from the landlord and / or relevant authorities (e.g. Building Authority or Housing Authority etc.) for proposed works with structural implications or proposed building works not exempted under section 41 of the Buildings Ordinance • Three sets of detailed as-fitted drawings of the ventilating system, if any • Others (please specify)

  11. Application Form Appendix 1 Summary of Works Items Requested (For FS/ BS rectification works items only) The amount requested for each works item such as sprinkler system, smoke/heat detection system, removal or rectification of unauthorized building works. Fees and Related Contractual Charges (Only applicable for application when Authorized Person / Consultant is appointed)- Preliminaries, Contingencies, Professional Fees, Lithography

  12. Application Form Appendix 2 Breakdown and Details of the Proposed Works Items • Item no. • Extent of each works item, its dimensions / specifications • Detailed location • Quantity & unit • Unit rate

  13. Application Form Appendix 2 Breakdown and Details of the Proposed Works Items(Con’t) • Amount • Justification for each proposed item Note: Please provide prerequisite documents (e.g. approval of the landlord / authority concerned, recommendation from other government departments, sketches, drawings, layout plans, installation plans, quotations, specifying material & works method etc.)

  14. Thank you