Stadium Surface Committee Information

Stadium Surface Committee Information. Stadium Surface Committee. Reconvened committee from 2002-2003 Focus: Research the viability of artificial surfaces and track replacement projects at each school.

Download Presentation

Stadium Surface Committee Information

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stadium Surface CommitteeInformation

  2. Stadium Surface Committee • Reconvened committee from 2002-2003 • Focus: Research the viability of artificial surfaces and track replacement projects at each school. • Committee representation – Board, Administration, Teachers, Community members, resource experts. • Sub-committee structure: - Usage - Safety - Maintenance - Cost

  3. Synthetic Turf Systems • Components: • Drainage layer (composite or multi-layered backing system • Grass-like fibers/blades • Various products include infill system composed of sand and/or rubber.

  4. Maximize Field Space

  5. Stadium Field Usage - Current • Current under-utilization of Stadium field space (used 5% of allowable time) • Used primarily for athletic contests: • Varsity/JV Boys-Girls Soccer • Varsity/JV Boys Football • Varsity Lacrosse • Physical education classes excluded from use • Limited access for Band and Spirit groups: 0 to 2 sessions per week in the fall and spring.

  6. Stadium Field Usage - Projected • Increased usage of Stadium field space (projected use at 78% of allowable time) • Increased contest use (fewer cancellations) • Reduces off-site needs; saves time, transportation, and rental fees. • Physical education classes daily use • Reduces over-use of current practice facilities (allows for frequency of field rotation) • Regularly scheduled Band and Spirit group use • Summer use (curricular, athletic, activity, summer leagues)

  7. Stadium Facility Usage 2008-2009 Fall Spring Summer

  8. Safety Considerations • Risk of injury • Many injury risks are related to the type of sport or activity rather than the type of field surface. • Concussions, sprains, twists and jams are common to all sports. • Risk of exposure to MRSA & other infectious diseases • MRSA infections are commonly linked to abrasions. • Proper treatment of abrasions limits exposure. • Prevention/reduction of risks factors/Communication to users.

  9. Safety Considerations • Risk of Exposure to Extreme Heat • Synthetic fields can generate heat issues. • District 211 heat index procedures limit exposure. • Risk Related to Sanitary Conditions • Major sources of the problem • Prevention/education • Risk Related to Exposure to Small Particles • Respiratory concerns • Facts to address concerns (crumb rubber, sand)

  10. Field Maintenance • Field & Running Track Considerations • Soccer field width (65-75 yds.) • 6 Lane/8 Lane tracks • Field event locations • Product life expectancy • Product life 8 yrs. (warranty period) • Based on volume of projected use – planning for 5 yr. replacement of field turf (carpet only) surface. O/M budget planning

  11. Stadium Surface/Track Cost Estimate

  12. Cost Per Hour of Use

  13. Site Engineering Services • Underground storm water management • Site planning (topography) • Survey • Permitting (Metropolitan Water Reclamation District)

  14. Other Maintenance Considerations • Repairs and maintenance • Field lighting (new and/or relocated) • Communications • Ancillary items • Hard wired systems (PA, internet, security) • Irrigation • Utilities

  15. Funding Considerations • Outright purchase - $1.3 million per site. Use of O/M Fund undesignated restricted balance • Meets capital improvement criteria • Existing program commitments are functional and support a systematic approach to provide equity among all five high schools. • Renovation of existing buildings are systematically assessed and scheduled for capital site improvements. • Future programs.

  16. Operations/Maintenance Fund Restricted Balance

  17. Other Funding Options • Other funding options discussed, but not recommended: • Lease/purchase option • Business/Community partnership – Fundraiser • Grants

  18. Area High School Installations

  19. Next Steps • Develop product selection specifications (turf types, fiber, backing systems, infill, base materials, lines/markings) • Meet with school parent groups to provide information about the Stadium Surface project consideration and request feedback.