1 / 9

ISE4 Integrated Demo

ISE4 Integrated Demo. Ver 2 May 11, 2005. Revised Arrangements Demo Scenario. Design agent Export AP 216 hull form Navy Import hull form - into Focus DB then to ASSET Run ASSET to do ship arrangements - will add decks, pilot house, machinery spaces, also define requirements

abbot-floyd
Download Presentation

ISE4 Integrated Demo

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISE4 Integrated Demo Ver 2 May 11, 2005

  2. Revised Arrangements Demo Scenario • Design agent • Export AP 216 hull form • Navy • Import hull form - into Focus DB then to ASSET • Run ASSET to do ship arrangements - will add decks, pilot house, machinery spaces, also define requirements • Output to Focus DB, Export AP 215 • Design agent • Import, complete ship arrangement • Add equipment • Navy • Import back to LEAPS for vulnerability tool assessment • Generate recommendation • Build yard • Import, fix arrangement ISE4 Integrated Demo

  3. Initial ASSET Arrangement + Requirements (LEAPS) Design Agent Revised Arrangements Demo Scenario AP 216 Hull Initial Arrangement Vulnerability Analysis (LEAPS) Complete Arrangement + Equipment Vulnerability Report Build Yard ISE4 Integrated Demo

  4. ISE4 Integrated Demo Arrangement Requirements (LEAPs) Ship check Project? Initial Arrangement (Tribon) Updated Initial Arrangement (Sener) Detailed Structural Design (Intergraph) Initial Electrical System Design (KSSI) FEM Analysis (EB) Structural Design Feedback (Intergraph) Neutral Manufacturing (ISPE) Yard Specific Manufacturing (EB & Intergraph ) ISE4 Integrated Demo

  5. ISE4 Demo Scenario • ASSET mission and compartment requirements generated in LEAPS (P21) • Create initial compartment and equipment arrangement (Tribon XML) • Include importing vendor data for main engine - CPC + AP 203 • Incorporate Atlantec SBIR demonstration to import equipment? • Update arrangement (Sener – P21) • Structural update required which impacts tank size (mission requirement) • Or incorporate Ship Check results to drive structural change • Demonstrate Initial Electrical System design (KSSI) • Electronic system in Pilot House • Transfer arrangements to detailed design (Intergraph) • Extract structure for analysis (Intergraph) • FEM analysis of Engine Room (EB) • Feedback from Analysis (Ingr) • Extract Structure for Manufacturing (Ingr) • Develop neutral structural manufacturing model (ISPE) • Generate yard-specific manufacturing data (EB, Ingr) • Compare EB and Avondale manufacturing outputs ISE4 Integrated Demo

  6. Demo Scenario Issues • Better way to integrate Electrical into demo? • Reason that arrangements are updated • Ship Check doesn’t fit with Initial Arrangement scenario • If LEAPS does not provide initial ASSET data • Could provide reason arrangements are updated • Claim Navy Analysis programs determined xxx ISE4 Integrated Demo

  7. Eng Analysis Demo Scenario AP 203 P21 Shipyard (Add to CPC, CAD) Vendor CAD Parts CPC Equip arrangement AP 227 P28 (COG, weight, location) Analysis Equip arrangement Compartmentation AP 215 P28 Ship Product Model (ISDP) AP 216 P21 AP 209 P28 AP 218 P28 Feedback AP 209 /218 P28 GUID, doc URL ISE4 Integrated Demo

  8. Notional Mediators Required ISE4 Integrated Demo

  9. P28 Mediators Required 209 218 216 227 203/ PLM 215 P28 P28 ARM P28 AIM P28 P28 P28 P28 P21 P21 P21 P21 ISE4 Integrated Demo

More Related