ISE4 Alternate Demo Scenario

ISE4 Alternate Demo Scenario. Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005. Initial ASSET Arrangement + Requirements (LEAPS). Design Agent. Revised Arrangements Demo Scenario. AP 216 Hull. Initial Arrangement.

Download Presentation

ISE4 Alternate Demo Scenario

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005

  2. Initial ASSET Arrangement + Requirements (LEAPS) Design Agent Revised Arrangements Demo Scenario AP 216 Hull Initial Arrangement Vulnerability Analysis (LEAPS) Complete Arrangement + Equipment Vulnerability Report Engineering Analysis Build Yards Steel Processing ISE4 Future Ship Acquisition Demo Proposal

  3. ISE4 Revised Future Ship Acquisition Demo Scenario • Mission Requirements and Initial Arrangements provided by the Navy via ASSET • TWR 841 will be used as input • TWR 841 Model Captured in FORAN to be treated as Concept Design • Send AP216 file to Navy (ASSET) for Analysis • ASSET will pose new mission requirements and generates an initial Arrangement (AP215 Model) • List of Compartments with Requirements plus possibly some minimal Geometry • Arrangement returned to Design Agent (FORAN) which sets up compartmentation and generates updated AP215 file (Part 21) • Demonstrate Initial Electrical System design (KSSI) • Electronic System in Pilot House • Navy selects Diesel Engine which fulfills base requirements and incorporates into ship contract ISE4 Future Ship Acquisition Demo Proposal

  4. ISE4 Revised Future Ship Acquisition Demo Scenario cont’d. • Two build yards (CAD Systems: ISDP and TRIBON) will be doing a collaborative design and are awarded a preliminary/detailed design contract • TRIBON will design Topside • ISDP will design below Decks • Shipyards add Diesel to CPC Catalog and receive AP203 file • Arrangements Model is transferred to TRIBON (P28) via AP215 exchange • Transfer requires Mediators between Part 28 and Part 21 files • Designs are created in ISDP, and TRIBON • Arrangements transferred via AP218 to LEAPS and COMMANDS for Analysis • COMMANDS creates mesh and sends to Analysis tools (e.g. PATRAN, ABACUS) • FEM Analysis performed on revised model of Engine Room • Analysis report generated • Design Agent sends Arrangements Model to LEAPS for Vulnerability Analysis ISE4 Future Ship Acquisition Demo Proposal

  5. ISE4 Revised Future Ship Acquisition Demo Scenario cont’d. • Extract Structure for Manufacturing (Intergraph) • Develop neutral structural manufacturing model (ISPE) • Generate yard-specific manufacturing data (EB, Avondale) • Compare EB and Avondale manufacturing outputs • Ship check existing TWR design • Provide scanned shots of Engine Room from Ship Check Data Capture Project • Emphasize synergy between these NSRP funded projects, even though Demo is separate and not part of Ship Check Data Capture ISE4 Future Ship Acquisition Demo Proposal

  6. Flowchart of Revised New Design Demo Scenario Concept Design (ASSET/LEAPS) Navy Analysis (LEAPS) Preliminary Design (FORAN) Engineering Analysis (COMMANDS) Collaborative Detailed Design (ISDP) (TRIBON) (Electrical – KSSI) Production (Steel Processing) Operations & Maintenance (Ship Check Results) ISE4 Future Ship Acquisition Demo Proposal

  7. ISE4 Alternate Demo Proposal NAVSEA Proposes Concept Design Alternative Proposals Analyzed STEP Description of Selected Model Transferred for Steel Processing Analysis Tools PATRAN ABACUS etc. Initial Arrangement FORAN COMMANDS See EADS Below Decks Arrangement ISDP – Des. 1 LEAPS Results Des. 1 See EADS Topside Arrangement TRIBON – Des. 2 Results Des. 2 ISE4 Future Ship Acquisition Demo Proposal

  8. Engineering Analysis Demo Scenario AP 203 P21 Shipyard (Add to CPC, CAD) Vendor CAD Parts CPC Equip arrangement AP 209 P28 AP 227 P28 (COG, weight, location) Analysis Equip arrangement Compartmentation AP 215 P28 Ship Product Model (ISDP) AP 216 P21 AP 209 P28 AP 218 P28 Feedback AP 209 /218 P28 GUID, doc URL EADS Note: Feedback loop only for winner (ISDP) Equipment exchange precedes competition ISE4 Future Ship Acquisition Demo Proposal

  9. P28 Mediators Required 209 218 216 227 203/ PLM 215 P28 P28 ARM P28 AIM P28 P28 P28 P28 P21 P21 P21 P21 P28 Higher Priority (Needed as Soon as Possible) P21 Processing Capability Currently Available P28 Lower Priority (Possibly Optional) ISE4 Future Ship Acquisition Demo Proposal

  10. Backup Slides ISE4 Future Ship Acquisition Demo Proposal

  11. TWR Propulsion Engine (Caterpillar 3512) Model ISE4 Future Ship Acquisition Demo Proposal

  12. TWR Reduction Gear Model ISE4 Future Ship Acquisition Demo Proposal

  13. Demo Scenario Issues • Scenario has analysis software used to discriminate among three proposed designs • More realistic than usual Demo Scenarios • Must find way to work Electrical and ISPE (Steel Processing) more smoothly into Demo • Steel Processing should be easily integrated with the Arrangements and Analysis scenarios, but we must determine what can be exchanged from this task ISE4 Future Ship Acquisition Demo Proposal

  14. Notional Mediators Required ISE4 Future Ship Acquisition Demo Proposal