1 / 26

WYOMING WATER & ENERGY LAW

NPDES Permitting Issues. Kara Brighton Hageman & Brighton, P.C . Cheyenne, WY. WYOMING WATER & ENERGY LAW. Today’s Presentation. Introduction Large Construction General Permit (LCGP) Storm Water Pollution Prevention Plan (SWPPP) Notable Changes to the LCGP

Download Presentation

WYOMING WATER & ENERGY LAW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY WYOMING WATER & ENERGY LAW

  2. Today’s Presentation • Introduction • Large Construction General Permit (LCGP) • Storm Water Pollution Prevention Plan (SWPPP) • Notable Changes to the LCGP • CWA Permits for Pesticide Application • Background • Permitting Information • Conclusion

  3. Introduction • Clean Water Act • Discharge of any pollutant from a point source into surface water of the United States • WYPDES Program • Wyoming Pollutant Discharge Elimination System • Storm Water Discharges - Construction • Non-Storm Water Discharges - Pesticides

  4. Introduction • “General Permit” • A Single Permit Issued to Cover a Large Number of Similar Discharges within an Area • WDEQ Reviews WYPDES Permit Applications • Determines if an individual permit is required

  5. Large Construction General Permit • Wyoming Water Quality Rules & Regulations • Chapter 2 • Minimization or Elimination in Storm Water Runoff • Including Sediment • Land Disturbance of Five or More Acres • Does Not Have to be Contiguous • Smaller Construction part of Larger Development • LCGP Continues Until Site is “Finally Stabilized” • Re-vegetated to 70% of Natural Cover

  6. Storm Water Pollution Prevention Plan • LCGP Requires a SWPPP • Must be submitted with Notice of Intent (NOI) to WDEQ 30 Days Before Construction Begins • NOI - Describes the construction project • SWPPP • Describes Potential Pollution Sources • Best Management Practices (BMPs)

  7. Notable Changes to LCGP • LCGP was renewed March 15, 2011 • 5 Year Permit - Expires March 15, 2016 • Revised Definitions • “Finally Stabilized” - Vegetation Must be Adaptable • “Operator” - Expanded • Entities that have the ability to modify project plans • “Reportable Quantity” - Reporting of Spills to WDEQ

  8. Notable Changes to LCGP • SWPPP must be Consistent with TMDL • Total Maximum Daily Load • Sediment, Suspended Solids, or Turbidity • NOI Requirements Expanded • “Common Plans of Development or Sale” • Must Identify Potential Storm Water Discharges to Waters with an Approved TMDL or on 303(d) List • Potential Discharges to Class 1 Waters

  9. Notable Changes to LCGP • Effluent Limitations - New Federal Regulations • Erosion & Sediment Control Minimum Standards • Removal of Sediment Transported Offsite • Protection of Storm Drain Inlets • Offsite Tracking of Sediment to Paved Areas • Stabilization of Disturbed Areas for Stalled Activity

  10. Notable Changes to LCGP • SWPPP Requirements Expanded • Joint SWPPPs Minimum Standards • Changes Made within 30 Days of Inspection • Uniform Format - SWPPP Template • Site Map Requirements • BMP Minimum Standards • Maintenance of Inspection Records

  11. CWA Permits for Pesticide Application • FIFRA / CWA • Federal Insecticide, Fungicide & Rodenticide Act • Litigation • National Cotton Council v. EPA - Sixth Circuit • Chemical Pesticides Regulated Under NPDES Program • January, 2009: Vacated EPA Rule • February, 2010: U.S. Supreme Court Denied Cert • EPA Requested Two Year Delay

  12. CWA Permits for Pesticide Application • Effective Date: April 9, 2011 • Extension: October 30, 2011 • Wyoming Issued: March 14, 2012 • Expire December 31, 2015 • Regulatory Burden • Affects 5.6 Million Applications Annually • 365,000 Applicators

  13. Major Pesticide Discharge General Permit General Permit Authorizes Discharges of Pesticides TO, OVER, IN Water of surface waters of state associated with: • Mosquitoes and Other Flying Pests • Aquatic Weed and Algae Control • Aquatic Nuisance Animal Control • Forest Canopy Pest Control • Discharges to Class 1 Waters

  14. Treatment Thresholds • Mosquitos and Other Flying Insect Pests • 640 Acres of Treatment Area • Weeds and Algae • 80 Acres of Treatment Area • 20 Linear Miles at Water’s Edge • Forest Canopy • 6400 Acres of Forest Canopy • Opt-In

  15. Permit Categories • None • Minor • Pesticide Applications that do NOT Exceed Thresholds OR • Major • Pesticide Applications that DO Exceed Thresholds • Any Pesticide Application near Class 1 Streams of State

  16. Minor Permit • No Fees • No Notice of Intent • No Annual Reporting Requirements • “Honor System” Permit • Only Need to Show if Complaint Filed and DEQ Investigates

  17. Minor Permits • Permit Conditions • Narrative rather than Numeric • Based on Best Management Practices • Reference FIFRA Label Instructions • Equipment: Maintenance, Calibration and Cleaning Required • Monitoring • Record Keeping • Adverse Incident Documentation & Reporting

  18. Major Permit • Filing Fee = $100 per year • Notice of Intent • Authorization • Annual Report due February 28th • Covers Previous Calendar Year • Pesticide Pollution Prevention Plan

  19. Notice of Intent • When to File • Contact Information • Location of Records • Treatment Area Locations • Type of Pesticide Use Pattern • Map • Other Information • Certification

  20. Annual report • Form Available from DEQ later this Year • Application Information • Weather Conditions • Calibration/Repair Documentation • Adverse Incidents

  21. Pesticide Pollution Prevention Plan • Deadlines • Know or Should Know: Prior to First Discharge • Did not Know or Should Not have Known: Prior to Exceeding Threshold • Emergency: No Later than 90 Days • 2012: By December 31, 2012 • Signature • Must Identify Responsible Individual • Must be Updated Once per Year

  22. P4 Requirements • Protocols • Spill and Adverse Incident Response Procedures • Application Equipment • Lowest Effective Amount of Pesticide • Treatment Areas • Use Patters and Application Dates • Names of Product and Amount Used • Environmental Conditions

  23. P4 Requirements (cont) • Document Unusual Effects to Non-Targets • Document Equipment Calibration, Cleaning and Repairs • Prior to First Application • Identify Target Species • Identify Factors Contributing to the Problem • Establish Densities of Target

  24. P4 Requirements (cont) • Implement Efficient Means to Minimize Discharges from Pesticides • No Action • Prevention • Mechanical or Physical Methods • Biological Control Agent Used • Pesticide Use

  25. P4 Requirements (cont) • If Pesticide Selected: • Conduct Surveillance • Assess Environmental Conditions • Evaluate using Pesticides against the Most Susceptible Development Stage of Target Pest

  26. Questions • Kara Brighton Hageman & Brighton, P.C. 222 E. 21st Street Cheyenne, WY 82001 307-635-4888 kbrighton@hblawoffice.com www.hblawoffice.com

More Related