PR002927 Basketball / Volleyball Practice Facility

PR002927 Basketball / Volleyball Practice Facility. General Contractor Pre-qualification. Agenda. Introductory Remarks Overview Construction Goals Submittal Requirements Questions / Answers. Welcome. Project Team. Client – UCB Athletics Tom McGrath, Sr. Assoc. Athletic Director

Download Presentation

PR002927 Basketball / Volleyball Practice Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PR002927Basketball / VolleyballPractice Facility General Contractor Pre-qualification

  2. Agenda • Introductory Remarks • Overview • Construction Goals • Submittal Requirements • Questions / Answers

  3. Welcome

  4. Project Team • Client – UCB Athletics • Tom McGrath, Sr. Assoc. Athletic Director • Tom McGann, Dir. Game Mgmt & Operations • UCB Planner – Tom Goodhew • UCB Project Mgr – Katherine Dunklau • Architect – Sink Combs Dethlefs • Andy Barnard, AIA • Steve King, AIA

  5. Overview - Project Description • Addition to the north side of the Coors Event Center • Approx. 36,000 sf, two practice courts • Est. Construction Cost - $8M • Est. Construction Period – March 2010 to March 2011

  6. Project Location

  7. Basketball / Volleyball Court

  8. Construction Goals • Bidding Period – Approx. February 2010 • Begin Construction – March 2010 • Substantial Completion – March 2011

  9. Construction Issues • Asbestos abatement approx. 100 lf tar impregnated black felt on 14” dia. HPS line • Temporary steam line • Site lay down area • Utility relocations • Fire sprinkler work within CEC • Excavation – approx.15’ cut

  10. Construction Issues (cont.) • Working adjacent to occupied building • Campus – faculty, staff, and students • Parking

  11. Submittal Requirements • Be sure to meet the minimum requirements • Please provide information in the order outlined with TABS • Provide relevant information • Include forms • Affidavit • MWBE

  12. Submittal Requirements (cont.) • Do not provide too much information • KEEP IT SIMPLE

  13. Question and Answers Submit in writing by email Formal response will be issued by addendum Thank you for coming