Project Team • Client – UCB Athletics • Tom McGrath, Sr. Assoc. Athletic Director • Tom McGann, Dir. Game Mgmt & Operations • UCB Planner – Tom Goodhew • UCB Project Mgr – Katherine Dunklau • Architect – Sink Combs Dethlefs • Andy Barnard, AIA • Steve King, AIA
Overview - Project Description • Addition to the north side of the Coors Event Center • Approx. 36,000 sf, two practice courts • Est. Construction Cost - $8M • Est. Construction Period – March 2010 to March 2011
Construction Goals • Bidding Period – Approx. February 2010 • Begin Construction – March 2010 • Substantial Completion – March 2011
Construction Issues • Asbestos abatement approx. 100 lf tar impregnated black felt on 14” dia. HPS line • Temporary steam line • Site lay down area • Utility relocations • Fire sprinkler work within CEC • Excavation – approx.15’ cut
Construction Issues (cont.) • Working adjacent to occupied building • Campus – faculty, staff, and students • Parking
Submittal Requirements • Be sure to meet the minimum requirements • Please provide information in the order outlined with TABS • Provide relevant information • Include forms • Affidavit • MWBE
Submittal Requirements (cont.) • Do not provide too much information • KEEP IT SIMPLE