NU-ROOF SCHIPHOL MEETING March 15th 2011 D’APPOLONIA
Update of the test plan and responsibilities Still on going LAB TESTS (INCLUDING ARTIFICIAL AGEING TESTS) Results on PCM: end of march TESTING RIG FOR ENERGY PERFORMANCE Start: beforenextgeneral meeting in June Start: beforenextgeneral meeting in June APPLICATION TESTS NATURAL AGEING TESTS 6 MONTHS Start: january 2012 ONE OR TWO FINAL PRODUCTS: DEMO
Testing Rig PROCEDURE: 1) Start with membrane alone without back materials Assemble the 4 versionswith the polystirene Make a first runwithconstantirradiationmethod 2) Glue metal and make a secondrun 3) Glueinsulation and make a thirdrun 4) Take another set ofmembranes and gluemortar and concrete Make a fourthrunwithconstantirradiationmethod 5) Take another set ofmembranes and glueinsulation and mortar and concrete Make a fifthrunwithconstantirradiationmethod 6) Ifpcmhaseffect take the threesetsofstratigraphies and make a risingsunsimulation (wholedayuntil 18 and thenswitch off the light to simulate chargeof PCM)
First general considerations on the project Testingrigis late: what are the reasonswhy the shippingfromBornerto NTUA went wrong? The associations are impatienttohearfrom some results and start collaboration on applicationprocedures, wepromised some preliminaryresultsbyApril Wp2 is due at month 16 (April): how long do wehavetopostpone wp2 delivery? When can we start sending some samplesforapplicationtests? Nextgeneral meeting = June Big disseminationevent = November
Other tests: to be updated on the test plan we all have agreed