The Low Emission Capacity Building ( LECB) Programme. Ministry of Environment Republic of Moldova. REPUBLIC OF MOLDOVA: NAMA Prioritization Experience. Mr. Ion Comendant, Team Leader Climate Change Office Ministry of Environment Republic of Moldova. 17 January, 2013

abril
Download Presentation

The Low Emission Capacity Building ( LECB) Programme

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Low Emission Capacity Building (LECB) Programme Ministry of Environment Republic of Moldova REPUBLIC OF MOLDOVA: NAMA Prioritization Experience Mr. Ion Comendant, Team Leader Climate Change Office Ministry of Environment Republic of Moldova 17 January, 2013 Global webinar

  2. Main characteristics of the Republic of Moldova’s LEDS Ministry of Environment Republic of Moldova Goal: • Integrate mitigation into National and Sectoral Development Strategies (mitigation aspiration goal: at least -25% reduction from 1990 level to 2020) • Decarbonize national economy while increasing energy security • Maximize economic opportunities and create climate-resilient economy Identification of priorities: Mitigation priorities identified for major economic sectors (i.e., energy, industry, transportation, buildings, agriculture, forestry, waste)Analytical basis: Analytical basis for LEDS development was GHG inventory for 1990-2005 and GHG emission projections by sector, developed in the frame of SNC (2009) for the period until 2030

  3. Timeframe of key activities Ministry of Environment Republic of Moldova LEDS/NAMAs Sept-Dec 2012: Prioritised list of NAMAs identified; LEDS adopted by government Sept. 2010: LEDS development initiated Jan-Aug 2012: stakeholder consultations on LEDS 2011-2013: TNA conducted in 4 stages: Technologies identified Barrier analysis & enabling framework Technology Action Plan (for 6 technologies) Development of project ideas Technology Needs Assessment (TNA)

  4. Approach used to select technologies (1) Ministry of Environment Republic of Moldova • Subsectors were identified based on GHG emissions (energy + agriculture → 69% of total GHGs) • For each subsector, national team (11 experts) proposed technologies according to 4 categories: • Small scale technologies available in short term • Small scale technologies available in medium to long term • Large scale technologies available in short term • Large scale technologies available in medium to long term

  5. Approach used to select technologies (2) Ministry of Environment Republic of Moldova • Where more than 4 technologies were identified in a given subsector, multi-criteria decision analysis (MCDA) was applied using Excel spreadsheet and a set of agreed benefits and cost criteria, namely: • Benefits: GHG emissions reductions; economic, environmental and social impact • Costs: investments; prices (since these parameters are very sensitive to national decision making) • Where 3 or less technologies were identified in a given subsector, prioritization was based on a performance matrix using only 2 criteria (investment cost + GHG emission reductions)

  6. Main challenges Ministry of Environment Republic of Moldova • Involving stakeholders in the technology prioritization process can be very time consuming • Multi-criteria decision analysis (MCDA) is time consuming and rules for applying MCDA were unclear → using the Excel spreadsheet tools created big difficulties for some stakeholders and experts • Further implementation of selected technologies would require more detailed consideration of the factors influencing their successful promotion • For electricity supply, the appropriate power source development scenarios need further elaboration to determine how selected prioritized technologies for power generation would be loaded over time → tools such as WASP or MARKAL would help in this context, but require more time and expertise again

  7. Recommendations/lessons learned Ministry of Environment Republic of Moldova • NAMAs should be identified and prioritized by smaller expert group and other stakeholders engaged in the final stage of NAMA selection, with decisions based on the underlying technical analysis • So that selected NAMAs will be implementable, each technology or measure should: • Pass a barrier analysis and have an enabling framework identified that will encourage NAMA diffusion • Be supported by a project idea or commercial offer report • TNA project results have been very useful for NAMAs identification, such as: • experience was gained on how to prioritize technologies • 100% of technologies from TNA project have been included in NAMA list

  8. THANK YOU for YOUR ATTENTION • E-mail: clima@mediu.gov.mdand/oricomendant@gmail.com