10 likes | 117 Views
Main Objectives for 2002. Upgrade of the Accelerator Network & LHC network design. Completion of S.C. phase II. Selection, Configuration and Operation of IP appliances. LHC computing prototypes. CN jmj. Infrastructure CM,ES,JS,MD CG.
E N D
Main Objectives for 2002 Upgrade of the Accelerator Network & LHC network design Completion of S.C. phase II Selection, Configuration and Operation of IP appliances LHC computing prototypes CN jmj Infrastructure CM,ES,JS,MD CG Passive/Active infrastructure logistics and CFT, S.C. phase II, Accelerator Network Infra Upgrade, Experimental Areas & Pits, Network extensions Software support & Engineering DF,MZ,NG IB Products evaluation and integration, DNS, DHCP, CFMGR (device configuration) Accelerator active infrastructure logistics & CFT 513C & LHC computing JAB,MC,<pparc> Computer center and backbone network design, Product Validation, Data Challenges, OpenLab Interactions with IT services Remedy Workflow NSO Ovdv ST-EL-FO, SL-CO, TCR relations Network Consultation office AR,IG AF,JLV First Line support, contract follow up, database consistencies, Network analysis Software for Operation EV,<new>,<fellow(s?)> MF LANDB, MTP, WEBREQ, SPECTRUM Remedy support IT/CS Campus Network Structure by Team for 2002