1 / 18

Update on SBS Back Tracker GEM @ UVa

Update on SBS Back Tracker GEM @ UVa. K. Gnanvo , N. Liyanage , V Nelyubin , K . Saenboonruang , Seth Saher , Nikolai Pillip (visiting from Univ. Tel Aviv, Israel). Preliminary tests and results Improvements for the next two prototypes. Design of 50 ×50 cm 2 Back Tracker GEM.

acton-gates
Download Presentation

Update on SBS Back Tracker GEM @ UVa

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on SBS Back Tracker GEM @ UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip(visiting from Univ. Tel Aviv, Israel) • Preliminary tests and results • Improvements for the next two prototypes

  2. Design of 50 ×50 cm2 Back Tracker GEM • Module of 50 × 50cm2to replace the 40 × 50cm2 • 32 modules to be built instead of 40 for the 8 SBS Back Tracker GEM chambers Reduce the overall cost and dead area • No protective resistors on the GEM foils  external resistor board • Individual HV test of all the sectors at different stages of the assembly and safer to operate during the assembly • Wider GEM frames and readout honeycomb support along x-axis • 30 mm instead of 8 mm, alignment holes away from active area • Room for strips connectors and GEM HV sectors electrodes • Holes for mechanical positioning of the chamber on the frame Triple GEM module 4 Triple GEM modules in a SBS Back Tracker chamber

  3. SBS Back Tracker GEM module Proto 1 HV divider Apv25-SRS FE cards Spark protection resistors Board

  4. Pedestal RMS noise • For 50 × 50 cm2 COMPASS-like readout, typical rms after common mode correction of the baseline is on average of 6-7 adc counts for apv25-SRS • @ 230 e-/adc  ~ 1200 to 1500 ENC • a cut at 5 sigma for zero suppression  ~ 6000 e- Pedestal RMS noise distribution over 16 APV y-strips (340 mm) x-strips (80 mm) ADC Ch counts

  5. Preliminary test with cosmic data X-Y strips charge sharing ratio Hit in X and Y strips Good S/N ratio at 4200 V X (adc) / Y (adc) = 1.34 Cluster ADC sum distribution X/Y strips charge sharing correlation

  6. Preliminary test with cosmic data Hit count distribution on Y-strips Event cluster position 2D map Event counts Hit count distribution on X-strips counts

  7. Non uniformity from the scintillator counters We use 2 set of 3 scintillators paddle in coincidence for the trigger on cosmic Changing the arrangement of the paddles in the set up lead to a big changes in the hit distribution profiles Main source of the non uniformity here

  8. Gain (non) uniformity of the chamber X • Gas flow uniform in Y direction  gas inlet and outlet • We suspects a non uniformity of the gain due to the gas flow in the X direction • The gas flow in X is facilitated by groove in the spacer but not sure if it is Y window Groove Mean cluster adc counts 2D map Drift cathode GEM foil 1 GEM foil 2 GEM foil 3 ADC counts Y X

  9. Suggestions for improvements for the next two prototypes

  10. Faraday cage shielding using GEM foil common electrode window Drift cathode GEM foil 1 GEM foil 2 GEM foil 3

  11. Safe area around the frame on GEM foil Current design • Problem • No space between the GEM Frame (inner part) and the GEM foil active area • Glue can leak onto the foil during assembly  Sector will spark at high rate  but Can be cured Proposed modification • Solution • We propose 1 mm clearance between the frame (inner part) and the GEM foil active area  Kapton foil with no holes

  12. New Gas distribution scheme for the chamber Current gas distribution scheme window Entrance window foil Drift cathode Drift cathode foil GEM foil 1 Proposed gas distribution scheme 3 GEM foils Frame_GEM GEM foil 2 Frame_GEM out GEM foil 3

  13. Charge sharing and 2D readout strips width old design 40 x 50 cm2 new design 40 x 50 cm2 Top strips: 140 mm Bottom strips: 360 mm Top strips: 90 mm Bottom strips: 360 mm X/Y ratio = 1.104  GOOD X/Y ratio= 1.34  BAD

  14. BACKUP

  15. APV25 Gain: MPD vs SRS

  16. HV test of the GEM sectors • We use an Iseg EHS 6 kV HV module in a Wiener crate, HV controlled through an internet protocol. • Fast ramp up mode at a rate of 1200 V/s. • The leakage current in the GEM is measured using a Keithley 6487 picoammeter, at sampling rate of 120 mswith a Labview interface and saved in txt file. • HV GEM sector ~ 2 nF and with a resistance the HV module is ~ 50 M, (once the voltage is achieved this resistance is shunted automatically within the supply). • HV of 550 V, the initial current is a couple of mA, then quickly drops and stabilizes to less 1 nAleakage. • We leave the HV for about 2 min and if no spark  sector is good Initial current with the HV ramping up and down

  17. HV test of the GEM sectors • Distribution of leakage current over all the 72 sectors (24 sectors per GEM foil and 3 foils per chamber) • HV Test is performed at 550V in N2 for naked, framed foils and in chamber foils • Average leakage current < 1 nA for all the tests naked GEM foils ~ 0.55 nA Framed GEM foils ~0.68 nA GEM foils in SBS Proto1 ~ 0.72 nA

  18. Recovering of a bad HV sector Excess of glue leaked onto the sector during assembly  sector recovered after curing on N2 or at 50 degree First test after assembly Second test one day later 4rd test three days later 3rd test two days later