An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Bigbite second GEM tracker

  2. SBS GEM Trackers Front Tracker Geometry 18 modules In Italy x6 • 50 cm x 40 cm Modules are assembled to form • larger chambers with different sizes • Front tracker: Six 40 cm x 150 cm GEM layers • INFN Funding: to be built in Italy • Polarimeter trackers: Eight 50 cm x 200 cm GEM layers • to be built in Virginia 76 modules In Virginia Collaboration: INFN (Roma, Genova, Catania, Bari) and UVa SBS GEM trackers will form the largest area GEM tracker in the world

  3. UVacomponentof SBS WBS 2 (Neutron FF) • Fabricate 29 GEM modules by Oct 2014. • Assemble and test at least one 50 cm x 200 cm GEM layer ( 5 modules) for Bigbite. • Our plan is to build 12 (of the 29) SBS modules and instrument them with APV electronics in 2013. • So it will be possible to assemble two back GEM layers for BB in time for A1n. • All costs are budgeted into SBS WBS 2; no extra cost to A1n. • Graduate students from UVa for installation and commissioning.

  4. Preparations for the SBS GEM project • A 3.5 m x 3 mlevel-1000 clean-room at UVa • Clean room in a 4 mx 10 m semi-clean (1000 level) area. • Equipment to build 40 cm x 50 cm SBS modules: • GEM foil stretcher, with tension monitoring • Dry N2 HV box, with picoammeter, for testing GEM foils • Large ultra-sonic bath for cleaning frames • APV 25 readout system developed in Italy, going into production now • Two APV25 based readout systems with 5000 channels for testing GEMs: these systems being incorporated into CODA now. • Wiener MPOD High Voltage system with 16 sensitive HV channels • GEM chamber prototyping • INFN and UVa groups have built and tested seven 10 cm x 10 cm prototypes • 40 cm x 50 cm module design complete, has been optimized with two prototypes. • Two 40 x 50 cm prototypes built in Italy, two more at UVa.

  5. Prototype GEM trackertests and results 70 mm position resolution 10 cm x 10 cm prototype GEM trackerprearedto go into hall A Chargedepositioncorrelationbetweenx and ystripes

  6. GEM moduleconstruction status at UVa • All parts for 2 chambers now at hand: • Readout planes arrived 2 weeks ago. – 1 Rome type + 2 Uvatype • Spent about 2 months developing techniques for GEM assembly • Used test frames and foils • Final procedure well established now. • Final assembly of the first chamber (Uva type) this week and next week • Readout and 2 GEMs already glued and tested. • 1 more GEM, Cathode and gas window by early next week. • Finish assembly by end of next week. ZIF connectors Panasonic connectors SBS readout ( E.Cisbani, INFN Italy) New design (K. Gnanvo. Uva)

  7. GEM moduleconstruction status at UVa New 40 cm x 50 cm GEM stretcher at Uva Fully equipped INFN 40x50 cm2 GEM module for a beam test at DESY Cleanroom at UVa GEM foil and Frame HV test box

  8. GEM R&D and assembly facility at UVa New 40 cm x 50 cm GEM stretcher at Uva • The mechanical stretcher • Use for stretching GEM foil and glue it to spacer frames to keep it flat • Stretch the foil to a tension bigger than 1kg/cm • Method developed by Bencivenni. Et al. (LNF Italy) for LHCb GEM chambers\

  9. Test framesglued

  10. GEM R&D and assembly facility at UVa • GEM foil and Frame HV test box: - • checkforcurent (sectorcurrent < 5 nA) and sectorcapacitance.The 3foilstested so far havebeengood. • Test foilswere bad (highercurrents)

  11. GEM R&D and assembly facility at UVa

  12. GEM R&D and assembly facility at UVa

  13. K. Gnanvo - SoLID Coll. Meeting, 02/03/12