NEXPReS WP5 - Cloud Correlation Work Package Overview

NEXPReS WP5 - Cloud Correlation Work Package Overview. Arpad Szomoru JIVE. Overview. Who & why Work packages Resources, progress Deliverables & milestones. Who & why. Participants & FTEs : JIVE (87), MPG (9), AALTO (9), TUM (15) Purpose: Extend advantages of e-VLBI to all VLBI

adamv
Download Presentation

NEXPReS WP5 - Cloud Correlation Work Package Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEXPReS WP5 - Cloud CorrelationWork Package Overview Arpad Szomoru JIVE

  2. Overview • Who & why • Work packages • Resources, progress • Deliverables & milestones NEXPReS- WP5: Cloud Correlation

  3. Who & why • Participants & FTEs: • JIVE (87), MPG (9), AALTO (9), TUM (15) • Purpose: • Extend advantages of e-VLBI to all VLBI • Transform complete VLBI observational chain: • Scheduling, setting, actual observing, buffering, real-time - delayed correlation • Transparent to user • Enable modification of observational parameters on the fly • Prepare and implement 4 Gbps recording/transmitting/playback • And beyond... NEXPReS- WP5: Cloud Correlation

  4. Work packages • Flexible buffering (JIVE, AALTO) • Buffering at stations: • Safeguard against loss through network failures • Complement e-observations at later time with full network • Mixed e/recorded VLBI first deliverable • Buffering at correlator: • Re-correlation with more stations, different parameters • Mark5B needed (or C) • 4 Gbps capability needed, hardware/software correlators • Implementation of VDIF standard • Integrate VDIF (and VTP?) in all EVN operations • Corner turning platform NEXPReS- WP5: Cloud Correlation

  5. Work packages (2) • Continuous quality monitoring & station remote control (TUM, MPG, JIVE) • RPC-based client/server solution for station monitoring and remote control • Authentication and authorization • Extension of current station-log monitoring and feedback • Near-continuous automated fringe checks • Network monitoring (overlap with WP6) • Automated network-dependent correlation (JIVE) • Determination of sustainable data rates • Scheduling of remote and local buffering • Reliable operator feedback mechanisms • Unattended correlation • Rapid response to observers for timely decisions on re-correlation NEXPReS- WP5: Cloud Correlation

  6. Resources, progress Start date of project far from optimal (1st of July) Unavoidable delay in hiring One ad out, closing date October 1st (scientific software engineer at JIVE) Second ad possibly end of year One JIVE staff member retired One JIVE staff member to return from secondment at NRAO One engineer hired at MPG on August 1, at TUM from September 1 No hires yet at AALTO Sizable effort from available JIVE staff towards first deliverable, no serious delays expected First TUM/MPG deliverable expected on time First kick-off telecon held end of August 20 September 2010 NEXPReS- WP5: Cloud Correlation Slide #6

  7. Deliverables • Mixed e-VLBI/recorded-VLBI at stations (3) • Metrics, selection criteria and user feedback (4) • Definition of specifications monitoring and remote control (4) • Automated job scheduling (9) • VDIF Mark5 conversion software (15) • Control systems and scheduling mechanisms for 4-Gbps recording equipment (18) • Unattended correlation (19) • Monitoring, remote control and client software including the authorization and authentication layer (22) • Control systems and scheduling mechanisms for 4-Gbps at correlator (23) • Corner-turning platform (24) • FS-integrated remote control system (28) • Automated delayed correlation (29) • Real-time correlation with simultaneous recording at the correlator (30) • Report on tests with Wettzell & Effelsberg stations (36) • Streamlined data reduction pipelines & user access (36) NEXPReS- WP5: Cloud Correlation

  8. Milestones Definition of specifications monitoring and remote control (4) Automated job scheduling (9) Unattended correlation (19) Control systems and scheduling mechanisms for 4-Gbps at correlator (23) 20 September 2010 NEXPReS- WP5: Cloud Correlation Slide #8