1 / 9

All Experimenters’ Meeting

August 26, 2013. All Experimenters’ Meeting. Machine Status. Proton Source Commissioning and Studies Linac – studies, maintenance and repair (QPS, LRF3) Booster – studies, maintenance and repair (WAPS ) Muon Campus chilled water leak Main Injector MI30 vacuum

adeola
Download Presentation

All Experimenters’ Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. August 26, 2013 All Experimenters’Meeting

  2. Machine Status • Proton Source Commissioning and Studies • Linac – studies, maintenance and repair (QPS, LRF3) • Booster – studies, maintenance and repair (WAPS) • Muon Campus chilled water leak • Main Injector • MI30 vacuum • Work progressing well, one complete section now. • MI back-fed from Master Sub-Station • KRS T85 work complete, but still using Feeder 45 for MI conventional • Need to schedule a 20 minute MI conventional power outage to remove the back-feed from Master Sub-Station after tunnel work. • SY120 • Neutrino Muon • G2 NM1 berm pipe progressing well • MTest • Preparing to sign startup paperwork, beam permit and run conditions • MC6 magnet replacement (4) • F4/A0 Cryo berm work

  3. MI 307 to 309 Section 1 Section 2 Section 3

  4. Section 1 • Section 1 • Had contamination • Collimator beam pipe cleaned in place • Everything else replaced • Leak checked and pumped down over weekend • Connecting to Section 2-3 today, installing bellows

  5. Section 2 • Contamination • Bellows • Pirani Gauge • Waiting on a theory • Section 2 • Installed new beam pipe • Connected to section 3 and leak checked • Pumped down over weekend and looks good

  6. Section 3 • Connected to Section 2 • Pumped down over weekend

  7. G2 – NM1 Berm Pipe Progress • 560 feet pulled, last 5 pipes lowered, welding Tuesday • Last pull next week M. Geelhoed 8/23/2013

  8. August 2013 DRAFT

  9. Shutdown 2012 Schedules and Links: Schedule can be accessed from the Operations Home Page - Schedules -> Operations Schedule Direct link to schedule - http://www-ad.fnal.gov/ops/schedule.html

More Related