60 likes | 222 Views
OLYMPUS Slow Control 26.04.11, DESY, Hamburg Anton A. Izotov, PNPI. High Voltage. Anton A. Izotov, PNPI, 26.04.11, DESY, Hamburg. Existing databases and tables. Anton A. Izotov, PNPI, 26.04.11, DESY, Hamburg. Available tasks @oslow. sb – Status Bar client, SB – Status Bar picture,
E N D
OLYMPUS Slow Control 26.04.11, DESY, Hamburg Anton A. Izotov, PNPI
High Voltage Anton A. Izotov, PNPI, 26.04.11, DESY, Hamburg
Existing databases and tables Anton A. Izotov, PNPI, 26.04.11, DESY, Hamburg
Available tasks @oslow • sb – Status Bar client, • SB – Status Bar picture, • hv – HV client for LeCroy, • HV – HV picture, • beam – TINE client for DORIS Globals, • bunch – TINE client for beam structure, • bpm – TINE client for BPM’s, • BEAM – beam picture, • targ – target status watchdog, • TFLOW – Target gas flow time graph, • SCAL – Scaler rates time graph, Anton A. Izotov, PNPI, 26.04.11, DESY, Hamburg
@oly01 • caen – HV client for CAEN, • MWPC wiremaps. Anton A. Izotov, PNPI, 26.04.11, DESY, Hamburg
Status and to do • User’s guide (soon), • What else? • Info, tasks, • Monitors. Anton A. Izotov, PNPI, 26.04.11, DESY, Hamburg