1 / 18

POHNPEI PORT AUTHORITY

POHNPEI PORT AUTHORITY. POHNPEI INTERNATIONAL AIRPORT’S REPORT TO T H E 2009 FAA PACIFIC AVIATION DIRECTORS’ WORKSHOP (4-6 APRIL, MAJURO). Old Air Terminal. Theme “Aviation Safety and Sustainability in the Pacific-Environment, Energy and Economic Viability”. Present Air Terminal.

adin
Download Presentation

POHNPEI PORT AUTHORITY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. POHNPEI PORT AUTHORITY POHNPEI INTERNATIONAL AIRPORT’S REPORT TO THE 2009 FAA PACIFIC AVIATION DIRECTORS’ WORKSHOP (4-6 APRIL, MAJURO)

  2. Old Air Terminal Theme “Aviation Safety and Sustainability in the Pacific-Environment, Energy and Economic Viability” Present Air Terminal

  3. Transformations • FAA Projects • JICA Project • PPA Projects and New Developments

  4. AIP PROJECT • Runway • Pavement Overlay • Shoulder Pavement • Markings and Signs • Lights • Runway Edge • PAPI • REIL • THRESHOLD

  5. AIP Project (continued) • ARFF • Fire Station • Fire Trucks and accessories • Tools • Radios • Access Road to ARFF

  6. JICA Project • Runway Extension • Arrival Terminal Building • Renovation of Existing Terminal- Departure • Baggage Screening Equipment • New Parking Lot • Stand-by Generator for Terminal Bldgs.

  7. PPA Projects Administration Building

  8. PPA Projects Repair of Terminal Building

  9. PPA Projects New Work Shop

  10. PPA Projects Security Posts

  11. Challenges • Political Challenges • Proposed exec. Bill to fold PPA into exec. Branch • Proposed Exec. Bill to limit PPA finances • Energy Issues

  12. Mitigating Measures • Energy Conservation • Economical Vehicles • Bike to Work • Conservation Program • Lights • Air Condition Units • Friday Afternoon Program • Cleanup • Maintenance

  13. Mitigating Measures • Walkway/Bike lane in Kolonia • Meeting with Organizers • Bike Riding • Joggers

  14. Pohnpei Cultural Day Co-Sponsorship Community Involvement

  15. School Kids Tours Community Involvement CCA ECE Awak

  16. Facilitating VIP Service Community Involvement

  17. Participate & Co-sponsor Sport Activities Community Involvement

  18. Kalahngan ?

More Related