Contractor InductionProperty Management Safety & Security
Agenda • Introduction • Roles of Jones Lang LaSalle • Essential Processes to Follow Before Work Commences • Essential Documents to Submit Before Work Commences • Emergency Contact Details • House Rules • Emergency Handling • Evacuation
Introduction Safe & Healthy Environment - Crucial for ALL: Personnel/ Contractors/ Agents Jones Lang LaSalle’s Policies: • SUPPORT & MAINTAIN: High standards of environmental sustainability • PROVIDE: safe & risk-free working environment • ADVISE: expectations on contractor on safety/ security & work practices • PROTECT: integrity & safety of all parties Health & Safety is PARAMOUNT: We need your COOPERATION!
Roles of Jones Lang LaSalle Daily Operations (Amend if necessary) • Maintenance • Security • Cleaning • Pest Control • Operation No direct contact with the client is allowed without our prior consent
Essential Processes to Follow Before Work Commences Before you commence work, you must make sure you and/or your staff have followed the following processes: • All contractors to report to the Property Manager • Attend staff induction & sign off • Obtain permission for daily access • Obtain Building Services Keys from the Building Management Office daily (for work within mechanical rooms) • Obtain approval for work likely to affect fire system • Inspect & tag all electrical tools by licensed electrician • Use safety tags ‘Out of Service’ & ‘Danger’ for all isolations/ disconnections
Essential Documents to Submit Before Work Commences Before you commence work, you must make sure you have submitted the following documents (wherever applicable): • Company License & Workers’ Licenses (if none before) • Valid Public Liability & Workers Compensation Insurance Certificates • Site specific OH & S Management Plan • Hot Works Permit • Safe Work Method Statement • System Impairment Notice (prior to any isolation where necessary) • Written Approval for Confined Space Work • Material Safety Data Sheet (MSDS) • After Hours Contact List
House Rules Safety • No work on live electrical system except for testing and commissioning and with safe work method statement in place • Insulate ladders for electrical works • All electrical cables are properly secured to prevent trip • Guards installed on electrical tools and machinery must be left on whilst in use
House Rules Safety • Explosives including explosive power tools cannot be used • Obtain prior approval from Building Management Office before any petrol or diesel powered equipment is used • Obtain hot works permit for works which will generate smoke/ flame, have suitable fire extinguisher in place • No structural cutting, coring, drilling, chasing of walls and slabs for conduits/ pipework without the approval from Building Management Office • Supply and use appropriate Personal Protective Equipment (PPE) for hot works, confined space works, coring drilling, high level works, etc.
House Rules Safety • Provide confined space training for works within confined space • Follow statutory requirements for works within confined space • Place barricade for high work • Comply with statutory requirement for scaffolding and works at ladders • Maintain safe distances & procedures for radiation hazards • Notify security if you/ your staff spotted sharp objects (incl. syringes) • Adhere to the hazardous materials requirements • Carry first aid kit and familiarize with building first aid facilities
House Rules Safety • Report damage, accidents, injuries to Property Manager immediately • Alert Building Management Office for smoke/ fire • Obey safety signs, notices & instructions • Prohibit from smoking, drugs & alcohol • Ensure your staff know location of emergency equipment • Secure loose objects
House Rules Environmental • Remove building waste materials daily • Maintain a clean & tidy state • Must not conduct noisy, dusty, smelly works near public accesses during office hours. • Use environmentally friendly chemicals/ substances • Ensure recommendations of relevant MSDS are followed • Supply power ventilation to dissipate odour/ vapour when using substances with acid/ offensive odour
House Rules Supervision • All works carried out by contractors must be supervised by an approved supervisor Handling & Storage • You are responsible for the security, handling and storage of all your materials whilst on site • Store goods/ equipment away from handling areas/ passageways Protection of Surfaces • You are responsible for protecting all surfaces and finished work from damage during the course of their work. Any damage will be rectified at your cost Work Completion • Sign out at the end of each working day or when work is completed
House Rules In General • Dress neat • Be courteous at all times • Make deliveries through building’s loading dock • Restrict loading/ unloading at loading dock for <X> minutes • Must not conduct noisy work during working hours • Noisy works and works that generate vibration are to be completed by <7:30am> and not start before <7pm>
Emergency Handling Some Reportable Incidents: • Fire • Pipe burst • Suspicious package found • Personal injury • Damage to property If you/ your staff detect any of the above, you/ your staff should: • Alert the Building Management Office at once • Cite details of the incident at the best of your knowledge
Evacuation • WHEN: Hearing of the alarm for the building you work at/ announcement of Building Management Office • MOVE: Yourself away from the immediate source of threat, e.g. follow the instructions by Fire Wardens or Security • SEE: Floor plan for escape direction & route <Refer to hardcopy of the Plan> • GO: Immediately to the nearest assembly point at <…>/ refuge floor, < X/ F> • REPORT: At once to the Building Management Office