1 / 13

Capture Cavity 1 (CC1) upgrade

Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque. Capture Cavity 1 (CC1) upgrade. CC1. General View. -Existing CC1 Vacuum vessel: 800mm-OD, 1800mm-long -Cold mass G10 Support Rods location. -Top port with Cryo piping. 5 3 1. 6 4 2. BEAM. 1 -80K (N 2 )-return

ailani
Download Presentation

Capture Cavity 1 (CC1) upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque Capture Cavity 1 (CC1) upgrade

  2. Y. Orlov CC1. General View -Existing CC1 Vacuum vessel: 800mm-OD, 1800mm-long -Cold mass G10 Support Rods location -Top port with Cryo piping 5 3 1 6 4 2 BEAM 1 -80K (N2)-return 2 -80K (N2)-supply 3 -4.5K (He)-cooldwn 4 -1.8K (He)-supply 5 -4.5K (He)-supply 6 -5.5K (He)- return -MC Port with New MC -Cold mass Fixing point in “Z”

  3. Y. Orlov CC1. Top Assembly. Y-Z View -Vacuum vessel -80K shield -5K intercept (x2) -Gate valve with supports (x2) -1.3 GHz cavity RI29 -Cold mass fixing G10 post in “Z” direction

  4. Y. Orlov CC1. Top Assembly, X-Y View -MC Warm -MC Cold -G10 Support Rods (x8) CM support Frame

  5. Y. Orlov CC1. Top Assembly, X-Z View G10 Support Rods -Existing GV access Ports US DS MC Warm with supports

  6. Y. Orlov CC1. 1.3GHz Cavity Serial #: TB9RI-29 -34.6 MV/m -MC cold -Blade tuner (install after CR assembly) -Ti He vessel with 2-phase He pipe -9 cell cavity -External magnetic shield (install after CL Assy

  7. Y. Orlov CC1. Cavity String after clean room -Bellows between Cavity flange and GV DS -Cavity without Blade Tuner Under vacuum (?) -Gate Valve (x2) -DS BP bellows connect to Vacuum Vessel (bellows restrains not shown) -US BP bellows connect to Vacuum Vessel (bellows restrain not shown) US

  8. Y. Orlov CC1. Cold Mass-front view DS -1.4 K He Supply line -US GV Support -80K intercept -5K He Piping line -5K Intercept MC -Warm Up Cool down Line -5K Intercept to Space Frame -Combined block for needle Bearings and G10 rods supports (x4) US -5K Intercept to Beam Pipe by Cu Bar (x2)

  9. Y. Orlov CC1. Cold Mass-back view -Pumping Line with He Level Indicator -1.3 GHz Cavity End Magnetic shields US -US HOM connector intercept -US GV Support with needle bearings -Tuner motor thermal intercept -Auminum Space Frame -DS HOM connector intercept DS -DS GV Support with needle bearings

  10. Y. Orlov CC1. Vibration -5K intercept 80K -80K Intercept 5K GV -G10 Vibration compensator (2 parts)

  11. Y. Orlov CC1. Support Frame with supports assembly - Weldable Al 6061 space frame (needle support places are machined after welding) -4 Needle supports combined with G10 rods support -US Gate Valve Support

  12. Y. Orlov Cavity Needle bearing supports Installation Gap ~4mm Plungers with spring washers (compensate thermal shrinkage) 322 mm “ Hard” screw connection

  13. Total DRAWINGS: ~91 -New drawings: 61+8(not released + released) -ILC drawings: 22 (Assembly DWG’s + parts DWG’s) • Ordered subassemblies: 3 (DWG##, MD-484490, MD- 484491, MC-484585) + existing ILC parts (were ordered for CM3-CM6) Y. Orlov CC1 upgrade production drawing status

More Related