TIPS AND TECHNIQUES FOR PMP EXAM

International Institute of Project Management (IIPM). TIPS AND TECHNIQUES FOR PMP EXAM. Tip # 1. Tense Verification - Verify the TENSE of the question before answering.

akamu
Download Presentation

TIPS AND TECHNIQUES FOR PMP EXAM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. International Institute of Project Management (IIPM) TIPS AND TECHNIQUES FOR PMP EXAM Tip # 1. Tense Verification - Verify the TENSE of the question before answering. IIPM

  2. Tip # 2. If the answer of the question is not known, opt an answer that you feel nearly correct. Don’t leave any question unanswered since there are no negative marks. Tip # 3. IPECC - Initiating, Planning, Executing, Controlling and Closing. IIPM

  3. Tip # 4. BCWP, BCWS and ACWP may be mentioned in the question as Actual Cost (AC), Planned Value (PV) and Earned Value (EV) respectively. Tip # 5. No minimum scope for individual knowledge area. IIPM

  4. Tip # 6. Read the questions twice and look for clues like NOT, ELSE, FIRST, MOSTLY, etc., Tip # 7. You won’t get questions from knowledge areas. Questions will be from process areas. IIPM

  5. Tip # 8. Budgeted Cost of Work Scheduled/ Performed.(BCWS/ BCWP) Tip # 9. There is no Grade in the System of Examination. Tip # 10. Only 4 answer choices (not 5) will be given for a question. IIPM

  6. Tip # 11. If the question is too big skip it for later revision, since revision of skipped questions is possible. Tip # 12. Choices like “All of the above”, “None of the above”, “A&B”, “B&C” and the like are not given in the exam. IIPM

  7. Tip # 13. If the values in Cost Variance or Schedule Variance is negative, then it is considered as bad or undesirable for any project. THANK YOU IIPM