Karagandy International Airport – New Transit Cargo-hub in Central Asia

Learn about Karagandy Airport's potential as a cargo transit hub connecting Asia and Europe. Route economic studies, airline partnerships, and region info included.

akeener
Download Presentation

Karagandy International Airport – New Transit Cargo-hub in Central Asia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Karagandy – Transit Airport Karagandy International Airport – New Transit Cargo-hub in Central Asia

  2. Karagandy – Transit Airport

  3. Plan: KGF intends to attract air cargo carriers to become the meeting point between Europe and Asia Karagandy Karagandy – Transit Airport

  4. Karagandy – Transit Airport Purpose of the Briefing Inform Airline of the potential role of Karagandy International Airport as a cargo transit airport for flights between Asia and Europe

  5. Karagandy – Transit Airport Route Economic Study:- Shanghai to Frankfurt

  6. Non-Stop Transit Sary-Arka Difference Sary-Arka vs. Almaty Total distance (NM) 4953 5160 -188 Total flight time 11:30 12:17 -0:21 Potential payload (Lbs) 149,732 200,000 - Potential revenue (USD) $218,694 $292,113 - Total cost (USD) $109,708 $121,467 -$7,048 Net revenue (USD) $108,986 $170,647 $7,047 Potential additional revenue (USD) $61,661 $7,048 Number of flights per year (approx.) 350 350 Potential additional yearly revenue (USD) $21,581,350 $2,466,800 Route Economic Study (cont’d)- Shanghai to Frankfurt Note: This example does not take into consideration possible additional transit cost (eg. crew change, etc.) Karagandy – Transit Airport

  7. Karagandy – Transit Airport Regular transit landings of MK Airlines crafts (since 20.03.2007)

  8. Karagandy – Transit Airport Regular landings of Tesis Cargo crafts (since 14.04.2007)

  9. Transit flight «Lufthansa Cargo» MD - 11 Karagandy – Transit Airport

  10. Transit flights of «Cargolux» (since 18.10.2007) Hong Kong - Luxembourg 4 flights per week Karagandy – Transit Airport

  11. Commercial flights of Aeroflot Cargo (since 18.10.07) Seoul - Moscow 5 flights per week Karagandy – Transit Airport

  12. Transit flights of «JADE Cargo» (since 28.08.2008) Shenzhen - Amsterdam 4 flights per week Karagandy – Transit Airport

  13. 2. Karaganda Region Karagandy – Transit Airport

  14. Karagandy – Transit Airport Karaganda Region Territory: 428,000 square km. Population: 1,331,700 Region center: Karaganda city Population of region center: 750,000 Karaganda City

  15. Karagandy – Transit Airport Karaganda Region (cont’d)- Economy

  16. Karagandy – Transit Airport Karaganda Region (cont’d) Large scale enterprises with foreign participation “Mittal Steel Temirtau” (“Mittal Steel”, Great Britain) “Kazakhmys” Ltd “Karaganda margarine factory” (“Ursem Holding”, Switzerland) “Konfety Karagandy” (U.I.G. Limited, Great Britain) “Efes Karaganda pivovarennyj zavod” (“Efes„ Turkey) “International coal technologies” (Eurasian group, Russia) “ Zhairemskyj GOK” (Eurasian group, Russia) “Central Asia Cement” (Malaysia) “Nova Zinc” (Nova-trading & Commerce AG) “Karaganda -Zhily” (“Enrhost. Ltd.” Great Britain) “Shubarkul coal plant” (Eurasian group, Russia) “Saranrezinotechnica” (“ECM Wertpapierdienstleistungs GmbH” Germany) “Karagandarezinotechnica„(“Sibhimimpex„ Russia)

  17. 3. Airport Infrastructure Karagandy – Transit Airport

  18. Karagandy – Transit Airport Karagandy Airport Modern facilities meeting international standards Yearly capacity of 2.5 millions passengers, 18,000 tons of cargo and 7,000 tons of mail

  19. Karagandy – Transit Airport Location Position 49° 40' 15.00" N 073° 20' 04.00" E Karaganda City 22 km NW 108 NM (200 km) from Astana 409 NM (755 km) from Almaty Astana Karagandy Almaty

  20. Karagandy – Transit Airport Airport Data Privately owned by Sky Service ICAO code UAKK IATA code KGF Elevation 538 meters (1,765 feet) Magnetic variation 008° E Time UTC+6 300 hectare surface Operates 24 hours No night curfew

  21. Karagandy – Transit Airport Maneuvering Area and Apron Runway 05/23 concrete surface 3,300 meters (10,831 feet) X 60 meters (Up to 3600 meters in 2008) Runway PCN 43/R/A/X/T (Permission for 2 landing MD-11 and 8 landing B747 per day) Upgrade to Runway PCN 68 by 2010 3 taxiways 23 parking places PCN 43 PCN 43 PCN 10

  22. Karagandy – Transit Airport Weather Services Available 24 hours Service in 2 languages Located in terminal building Pre-flight briefings METAR TAF Possible alternates (Astana, Almaty and Bishkek)

  23. Karagandy – Transit Airport Weather Conditions Located in the depth of mainland, in the steppe area, which causes the sharp continental climate Coldest month: January (average -15˚ C) Hottest month: July (average +20˚ C) Average yearly precipitations: 315 mm Snow from 15 November to 1 April (layer 8-21 cm) Prevailing winds: October - March: south west April - December: north east

  24. Karagandy – Transit Airport Weather Conditions (cont’d) No suspended aircraft operations due to fog Airport accessibility: CAT I: 99,62% CAT II: would be 99,95% In the last 5 years aircraft operations were suspended only 158 hours due to ice Source: Karagandy

  25. Karagandy – Transit Airport Hangar 4662 square meters Height 21 meters Steel framework Can accommodate A310

  26. Karagandy – Transit Airport Cargo Terminal S -3456 m2 Capacity – 40 000 ton/year All types of Cargo Fire safety system, 3 temperature modes Auto-control WMS system, Customs service

  27. Firehouses • 2 firehouses • 5 fire vehicles and a control center • 9 categories for fire safety Karagandy – Transit Airport

  28. Fuel Supply • Arrives into Karaganda City by rail • Stocked at a facility near the railway line • Delivered to the airport by tanker trucks • Systematic quality checks, prior to storage • Delivery into plane by tanker trucks • Airport storage capacity of 4,575 m³ • 1 tanker (80 m³), 2 tankers (60 m³) and 4 fuel tanker trucks (22 m3) at the airport Karagandy – Transit Airport

  29. Karagandy – Transit Airport Terminal Building 30,000 square meters Planning for 1,200 passengers per hour Peak passenger flow 250 passengers 9 manual check-in positions 8 boarding gates VIP area Immigration service

  30. Karagandy – Transit Airport Passenger: Almaty (daily) Moscow (Domodedovo - 4 flights per week)‏ St. Petersburg (2 flights per week)‏ Frankfurt (Kostanay – 1 flight per week)‏ Hannover (Kostanay - 1 flight per week)‏ Antalya (1 flight per week)‏ Minsk (1 flight per week) Novosibirsk (1 flight per week)‏ Istanbul (planned)‏ Sharja (planned)‏ Urumqi (planned)‏ Cargo: Macao (2 flights per week)‏ Hong Kong (2 flights per week)‏ Luxembourg (2 flights per week)‏ Shanghai ( 2 flights per week)‏ Tyanzin (3 flights per week)‏ Tallin (3 flights per week)‏ Moscow (Sheremetevo 3 flights per week)‏ Hahn (Frankfurt 3 flights per week)‏ Seoul (3 flights per week)‏ Sharja (planned)‏ Istanbul (planned) Pekin (planned)‏ Amsterdam (planned)‏ London (planned)‏ Destinations

  31. Karagandy – Transit Airport Downtown Hotels COSMONAUT http://www.hotelcosmonaut.kz ALATAU http://www.hotel-alatau.kz CHAIKAhttp://chaika.karaganda.kz DOSTAR ALEM http://www.dostar-alem.kz

  32. The Cosmonaut Hotel **** • Telecommunication services • High speed internet • Satellite TV • Gym • Pool • Bar • Restaurant • Outdoor terraces • Park • http://www.hotelcosmonaut.kz Karagandy – Transit Airport

  33. Karagandy – Transit Airport In 2006-2007 Karagandy International Airport received an input of over 40 mln USD of investments. Investments • We have always welcomed and will always welcomeairlines to audit our airport, such as Lufthansa, Cargolux, Austrian Airlines, Air Astana, KLM and also Shanghai Airlines. • We want to be compliant with your safety, operational and infrastructure requirements

  34. Technical center • 2008 New Technical Center created for MD-11 &Boeing 747Line Maintenance • Today there are 6 educated engineers available in the airport (5 of those are certified for В1 и В2 to service MD-11, 2 for Boeing 747-200,300) • We have 5 more who on Lufthansa Training now and starting on October we have certified specialists for Boeing 747-200,300,400. Karagandy – Transit Airport

  35. Trainings • Lufthansa Consulting provided with ground handling trainings and trained Karagandy Airport staff for fuelling, de-icing aircrafts and DGR • The training program is based on IATA recommendations widely recognized by international aviation community. After these trainings 28 employees have received the official IATA Certificates. Karagandy – Transit Airport

  36. Karagandy – Transit Airport We waiting for your aircrafts in our airport! Thank you!