30 likes | 162 Views
Status of 1 st Annual Report. Its content : Scientific (cf. SRF and HIPPI for JRAs) Structured by WP Proper identification of the contractor contributions Table of subtasks by WP (Gantt chart OK for SRF) Its form:
E N D
Status of 1st Annual Report • Its content : • Scientific (cf. SRF and HIPPI for JRAs) • Structured by WP • Proper identification of the contractor contributions • Table of subtasks by WP (Gantt chart OK for SRF) • Its form: • Use existing 2004 template for tables, including date format, fonts sizes and types • Try to reproduce all ANNUAL tables in intermediate reports • Homogeneity
Status of Annual Report • Warning (useless) : LAST version needed, otherwise too much re-editing • ELAN : 12 february (WP4 tables) • BENE: 15 february • HHH: 4 february • SRF: 18 february • PHIN: 19 february • HIPPI:14 february • NED: 3 february
Status of Annual Report • CD ROM : • not yet required by Brussels (???) • I miss the two NED deliverables • I miss the annual reports with front page • Got HIPPI, SRF, ELAN, PHIN, NED…