1 / 26

Shawn Bentley Chris Mueller Erick Janke Nic Langlois Jack Huynh

Team 4: Staff. Shawn Bentley Chris Mueller Erick Janke Nic Langlois Jack Huynh. EE, Spanish minor EE EE EE & Physics EE. Team 4: Expertise & Experience. Shawn Bentley Chris Mueller Erick Janke. Expertise: Industrial Electric Motors, Nanotechnology, Expertise: 2 internships

alban
Download Presentation

Shawn Bentley Chris Mueller Erick Janke Nic Langlois Jack Huynh

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team 4: Staff • Shawn Bentley • Chris Mueller • Erick Janke • Nic Langlois • Jack Huynh • EE, Spanish minor • EE • EE • EE & Physics • EE

  2. Team 4: Expertise & Experience • Shawn Bentley • Chris Mueller • Erick Janke • Expertise: Industrial Electric Motors, Nanotechnology, Expertise: 2 internships • Expertise: DSP, Materials Engineering Experience: 1 internship • Expertise: Industrial Controls

  3. Team 4: Expertise & Experience • Nic Langlois • Jack Huynh • Expertise: Microwave Engineering, EMF Experience: Physics research • Expertise: Power System Testing Experience: Industrial Power System Testing

  4. Team 4: Weekly Availability Worksheet • Shawn Bentley • Chris Mueller • Erick Janke • Time 1: Weekends Time 2: Tuesday Time 3: Friday Time 4:Weeknights • Time 1: Weekends Time 2: Tuesday Time 3: Weeknights • Time 1: Weekends Time 2: Tuesday

  5. Team 4: Weekly Availability Worksheet Nic Langlois Jack Huynh • Time 1: Weekends Time 2:Weeknights Time 1:Weekends Time 2: Friday • Time 3:Weeknights

  6. Team 4: Weekly Project Meeting Plan • Weekly Meeting 1: EMS, Saturday 5-7PM Owner, Expected Attendees & Purpose: • Weekly Meeting 2: EMS, Sunday 1-3PM Owner, Expected Attendees & Purpose:

  7. Team 4 : Total Resources • 480 Man hours • $250 for key part availability for material and prototyping

  8. Team 4 : Decision Making • We will take a vote amongst the group in order to make decisions which influence the project. • If teams cannot make effective decisions according to their agreed upon guideline, they may appeal to their Lab Assistant and upwards to the Prof/Lect • The Prof/Lect has the final say on any team decisions.

  9. Team 4: Roles • Lead Project Integrator (LPI): Shawn Bentley • Lead System Designer (LSD): Chris Mueller • Lead Presentation Manager (LPM): Nic Langlois • Lead Report Manager (LPM): Jack Huynh • Lead Manufacturing Mgr (LMM): Erick Janke

  10. Team 4: Project Ideas • Dynamic Aquatic Environmental Control • Electric Window Shading • My Bar (Automated Bartender) • PC based Oscilloscope

  11. Controls Temperature, pH, conductivity, and oxygen level Monitors vital environmental conditions of fish tanks Cost effective, safe, labor saving Optional computer controlled display Team 4: Project Idea #1 Dynamic Aquatic Environmental Control

  12. Team 4: Project Idea #1D.A.E.C. Power Supply Keypad Display Temp. Sensor Signal Conditioning Controller Output interface Temperature Control Output interface pH Control pH Sensor Signal Conditioning Output interface Signal Conditioning Conductivity Control Conductivity Sensor Output interface Aerator O2 Sensor Signal Conditioning

  13. 21st Century Window covering Residential and Commercial installation Save energy Easy to clean Team 4: Project Idea #2Electric Window Shading

  14. Team 4: Project Idea #2Electronic Window Shade Photo Sensor Keypad / Display Microcontroller Power Source Tint Controller

  15. Provide professional level service to social gatherings at your home, and save money on refreshments by perfectly poured mixed drink Keypad with a LCD display Inventory control Optional computer interface Team 4: Project Idea #3My Bar (Automated Bartender)

  16. Team 4: Project Idea #3 My Bar Bottle Sensor Package User Interface Microcontroller CO2 Mechanism Power Source Dispenser Mechanism

  17. Student test instrument Cost effective alternative for hobbyists PC based, 0-10Mhz input freq, 50mV to 50V input level, 8 bit resolution Time Based or Spectrum Analyzer mode Team 4: Project Idea #4 PC Oscilloscope

  18. Team 4: Project Idea #4 PC based Oscilloscope

  19. Very interested in the idea and purpose of this product Device could improve habitat conditions on several scales Enough design blocks Idea meets all the expectations and fills all requirements of the class Project is scalable Meets financial and time restraints Given a score of 5 Team 4: Evaluation of Project Idea # 1D.A.E.C

  20. Interesting idea and purpose of this product Not enough design blocks for our team to satisfy the class requirements Idea does not meet all the requirements of the class project The cost of the material required is out of the financial scope Given a score of 3 Team 4: Evaluation of Project Idea #2Electronic Window Shade

  21. Interesting idea and purpose of this product Not enough design blocks for our team to satisfy the class requirements Idea does not meet all the requirements of the class project The cost of the material required is out of the financial scope Project not appropriate for this course Given a score of 3.5 Team 4: Evaluation of Project Idea # 3 My Bar

  22. Interesting idea and purpose of this product Enough design blocks As a group we have minimal experience in RF technology. Idea does not meet all the requirements of the class project The cost of the material required is out of the financial scope Does not meet time constraints Given a score of 4 Team 4: Evaluation of Project Idea # 4 PC based Oscilloscope

  23. Economic Total Market Size: $200,000 Estimated Annual Volume: 100 Minimum List Price: $2,000 Maximum Product Material Cost: $300 Maximum Production Cost: $700 Marketing Market Geography: U.S.A. Market Demography: Fish Owners Competitors: Jandy, Hayward, Intermatic Business Case

  24. Operating Temperature Range: 50 – 90 OF Operating Humidity Range: 0 – 100 % R.H. non-condensing Storage Temperature Range: -10 – 70 OC Storage Humidity Range: 0 – 100 % R.H. non-condensing Storage Duration: 1 year Standard RequirementsEnvironmental

  25. Power Input Voltage Range: 102 – 132 Vac Maximum Power Consumption: 250 W Life Cycle Product Life Time: 10 years Full Warranty Period: 60 days Service Strategy: Factory Repair Standard Requirements

  26. Input 12 bit Sampling once / second Control +/- 2 OF (min 5 OF above ambient) +/- ___ pH +/- ___ uS +/- 5 % O2 Performance RequirementsElectrical

More Related