SITES IN SERIES Complex Watersheds. SITES SOFTWARE APPLICATION SEMINAR. __________________________ SITES 2005.1.4 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS. TRAINING OBJECTIVES. Working knowledge of SITES software for a simple series routing. SUBWATERSHED.
E N D
SITES IN SERIES Complex Watersheds SITES SOFTWARE APPLICATION SEMINAR __________________________ SITES 2005.1.4 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS
TRAINING OBJECTIVES • Working knowledge of SITES software for a simple series routing
SUBWATERSHED STRUCTURE REACH NODE or JUNCTION REACH STRUCTURE
Schematic diagram of the example in the previous slide 58-3 58 Model of routing diagram for site 58d 58d
There are 17 sites in this watershed under consideration. Site 14 is above 15. There are 16 sites above 17. SITES 14 & 15 LOWER SITE 17 (B-1)
Sites 14 & 15 Lower Site 17
Recall that sites 14 and 15 are a portion of the previous schematic. Elements are added by default in the upstream direction.
TOOL BAR FOR FIRST SITE STARTINGTHE WATERSHED SCHEMATIC
NOW ADD UPPER SITE The upper site is considered built or in place for the design of the lower site.
Upper Site (designed and considered in place before the start of series routing for design of Lower Site) Reach 3500’ - with cross-section #200 Lower Site (to be designed) Sites in Series Example
On the first screen, either start a new project or open an existing project (created earlier using the interface).
Last 5 The last 5 projects worked on will show up on the file menu. Click to load one of these projects.
Right clicking in the peach colored area brings up the GoTo Block
Right clicking on an element causes a menu to appear. Selecting “edit element” allows data entry or revision.
Highlight “edit element” to edit existing data or input data for the element.
Right clicking on the upper site brings up the menu which will allow the user to import a designed site.
Note the reach ID X-section rating information
After the file is “Built” the output data can be displayed. Below the hydrographs with 200’ wide spillway is highlighted.
Selecting “output” from the menu gives text output. For the lower site it will look like the output from the .out file. Note the edit is not available.
Select the data fields to be displayed by rows on the summary table.