An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tunisian project portfolio CDM Investor Forum DJERBA, 22 - 24 September 2004

  2. Portfolio of 8 projects presented in the 1st NC 10 CDM Small scale projects portfolio with UNDP support 2001 2003 2004 Action plan for GHG Mitigation CDM Project priority areas (CDM potential) PDD for 2 CDM full size projects with the support of Canadian Cooperation PDD for 2 CDM small projects financed by the ANME • Efficient street lighting project • Methane valorisation in Waste Water treatment station • Zounkar Wind farm • Enfidha Cardboard Company cogeneration project

  3. First CDM Projects Portfolio • Portfolio presented in the first National Communication • 8 projects • Cogeneration • ESCO • Wind Farm • Biogas • Solar Water heating • Freight plant • Public lighting • Low consumption lamps Energy saving : 5,5 MTEO GHG emission reduction: 16 MTECO2

  4. CDM Small Scale Projects Portfolio • Study order by ANME and financed by the UNDP • Pre-identification of 10 CDM Small Scale Projects

  5. CDM Potential (Priority areas)

  6. Cogeneration of Heat and Power at Enfidha Cardboard Company (ECC) • Site: East-Centre, 100 km from Tunis Capital • Capacity: 90 tons/day of carton from recycled paper • Project Activity : Installation of 3,5 MW of cogeneration capacity

  7. Cogeneration of Heat and Power at Enfidha Cardboard Company (ECC) • Energy saving: 25 GWh/year • Emission reductions: 6,500 tCO2e/yr • Starting date: 1/01/2006 (starting of the crediting period) • Baseline: Metrogas de San Bernardo (NM-0018) – under review by the Executive Board

  8. Cogeneration of Heat and Power at Enfidha Cardboard Company (ECC) • Investment to mobilize : $US 3.5 million • Resources: • Self financing • Subsidies through the Energy Conservation Support Programme and the Industry Modernization Programme • Commercial Bank Credit • Supplier Credit

  9. Cogeneration of Heat and Power at Enfidha Cardboard Company (ECC) • PDD Status: Preliminary version • Project Developer: ECONOLER • Under review by ANME

  10. Wind Farm of Zounkar • Site: Bizerte, North of Tunisia at 60 km from Tunis Capital • Project Activity : Electricity production from wind farm connected to the grid • Capacity: 90 MW

  11. Wind Farm of Zounkar • Energy saving: 318 GWh/year • Emission reductions: 160ktCO2e/yr • Starting date: 1/01/2006 (starting of the crediting period) • Baseline: Methodology of NM-0012 wind farm project of Wigton in Jamaica

  12. Wind Farm of Zounkar • Investment to mobilize : $US 120 million • Resources: • Self financing (30% of the investment) • Commercial Bank • Subsidies through the Energy Conservation Support Programme

  13. Wind Farm of Zounkar • PDD Status: Preliminary version • Project Developer: ECONOLER - ENERCIEL • Under review by ANME

  14. Efficient Street Lighting • Site: Districts of Ariana, Goulette and Mourouj (Tunis Capital) • Project Activity : Dissemination of power modulators • Modulators for 40.000 street lamps (6,5 MVA)

  15. Efficient Street Lighting • Energy saving: 6,5 GWh/year • Emission reductions: 3,800 tCO2e/yr • Starting date: 1/01/2006 (starting of the crediting period)

  16. Efficient Street Lighting • Investment to mobilize : $US 2,6 million • Resources: • District Self financing • Subsidies through the Energy Conservation Support Programme • Communal Fund

  17. Efficient Street Lighting • PDD Status: under development • Project Developer: ANME

  18. Biogas valorisation in the waste water treatment station of Nabeul • Site: Nabeul, East-North, 60 km from Tunis Capital • Project Activity :Methane recuperation and use for heating • Recuperation of 42,000 m3 of Methane/yr

  19. Biogas valorisation in the waste water treatment station of Nabeul • Energy saving: 60000 l of fuel/yr (54 TEO) • Emission reductions: 7,500 tCO2e/yr • Starting date: 1/01/2006 (starting of the crediting period)

  20. Biogas valorisation in the waste water treatment station of Nabeul • Investment to mobilize : $US 0.2 million • Resources: • Self financing of ONAS • Subsidies through the Energy Conservation Support Programme and the Industry Modernization Programme

  21. Biogas valorisation in the waste water treatment station of Nabeul • PDD Status: Preliminary version • Project Developer: ANME • Under review by ANME