NEW INTERNATIONAL AIRPORT OF CHINCHERO – CUSCO CALLED • Location: Cusco. • Description: The project comprises the concession to design, build, finance, operate and maintain the new international airport of Chinchero – Cusco(AICC) • Estimated investment*: US$ 658 million • Type of concession: Co-financed • Concession period: 40 years • Estimated award date: I QT 2014.
Panamericana Sur highway Road Network N° 6 GENERAL SAN MARTÍN PORT TERMINAL CALLED • Location: Ica • Description: The project comprises the concession to design, build, finance, operate and maintain of the General San Martín Port Terminal. Initial works: • Dredging • Multi-purpose dock • Yard for bulk cargo and other cargo • Support facilities • Electricity interconnection • 2 mobile cranes • Yard equipment • Other equipment for general loading • Estimated investment (VAT not included): US$ 103 million • Type of concession : Self-sustaining • Concession period: 30 years. • Estimatedaward date: I Quarter 2014. BRAZIL PACIFIC OCEAN
THE AMAZON WATERWAY CALLED • Location: Loreto and Ucayali. • Description:The project comprises the implementationof works and actions to improve the navigability and transit of pasenger and cargo on the Amazonas, Marañón, Huallaga and Ucayali rivers. • Dredging on critical areas (Malos Pasos) and on the access to the Port of Iquitos. • GPS information system on the route of the navigation channel. • Installation of level measuring stations with transmission of information. • System of monitoring of navigability conditions. • Cleaning system. • Estimated investment (VAT not included): US$ 65 million • Type of concession : Co-financed • Concession period: 20 years. • Estimated date of award: I Quarter 2014. BRAZIL PACIFIC OCEAN
LINE 2 AND BRANCH LINE OF FAUCETT AV. - GAMBETTA AV. OF THE BASIC NETWORK OF THE METRO OF LIMA AND CALLAO CALLED • Location: Lima and Callao. • Description: The project comprises the concession to design, build, finance, supply of electromechanical equipment, acquire rolling equipment, operate and maintain Line 2 of the electric mass transportation system, it will have an approximated extension of 35 km and will cross 13 districts of Metropolitan Lima. • Estimated investment (VAT notincluded):US$ 5.701 million (1, 2 and 3 stage) • Type of concession: Co-financed • Estimated award date : I Quarter 2014.
LINES 3 AND 4 OF THE BASIC NETWORK OF THE METRO OF LIMA AND CALLAO TO BE CALLED • Location: Lima and Callao. • Description:The project comprises the concession to design, finance, build, provision of electromechanical equipment, purchase of rolling stock, operation and maintenance of Line 3 and Line 4. • Estimated investment: Under evaluation • Type of concession : Co-financed • Concession Period:35 years Approximate length Estimated award date
HUANCAYO - HUANCAVELICA RAILWAY • Location: Junín and Huancavelica. • Description: Project oriented to the transportation of passengers and cargo, which comprises the execution of the following works along the 128 Km of the existing railway: • Railway upgrade • Changes to the tracks in critical sectors • Purchase of rolling stock • Reinforcement of 15 railway bridges • Extension of 38 tunnels for standard gauge rolling stock (1,435 mm) • Upgrades to the signaling and telecommunication systems • Draining works • The project includes the interoperability with Ferrocarril Central (railway service with standard gauge of 25 ton per axle) for the connection of high Andes regions with the port of Callao and the Santa Anita market. • Estimated investment: Under evaluation • Type of concession :Co-financed • Concession Period: 30 years • Estimatedaward date: I Quarter 2015 TO BE CALLED
FAST MONORAIL MASS TRANSPORTATION SYSTEM - AREQUIPA Location: Arequipa Description: A private initiative for the design, construction, electromagnetic equipment, systems, rolling stock, financing, operation and maintenance of a 14 Km fast mass transportation system on an elevated track. • Estimated Investment: Studies in progress • Type of concession : Co-financed • Estimatedaward date: IV Quarter 2014
LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 4 TO BE CALLED • Location: Junín, Huancavelica, Ayacucho and Apurímac. • Description:The project comprises the execution of upgrade and rehabilitation works (117 km), initial periodic maintenance (160 km); and subsequent maintenance and operation of 651 Km, in order to reach and maintain the established service levels on the railway route. • Estimated investment: The sector is conducting the final engineering studies. • Type of concession : Co-financed • Concession period: 25 years • Estimated date of award: I Quarter 2015.
LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 5 TO BE CALLED • Location: Cusco and Puno. • Description:The project comprises the regular initial maintenance, and operation and maintenance of all the Section (422 km), in order to obtain the required level of service. • Estimated Investment: The sector is updating the upgrading and improvement costs • Type of concession: Co-financed • Concession period: 25 years. • Estimated award date : II Quarter 2015.
PANAMERICANA SUR HIGHWAY: SECTION ICA- DV. QUILCA TO BE CALLED • Location: Ica and Arequipa • Description: Private initiative for the concession to build, operate and maintain the following infrastructure: Vía de Evitamiento de Ica, Second road Ev. Ica - Ov. Ocucaje, Vía de Evitamiento de Palpa, Vía de Evitamiento de Nazca and section Nazca - DV. Quilca. • Estimated investment: Under Evaluation. • Type of concession: Self sustaining • Estimated award date: 2015
CONCESSIONS IN URBAN AREAS PERIPHERAL RING ROAD TO BE CALLED Ring road Location: Lima and Callao Description: Private initiative for the construction, financing, operation and maintenance of a highway from Av. Elmer Faucett to Av. Circunvalación (approx. 33 Km), according to the technical parameters and service levels established. Estimated Investment: Studies in progress Type of concession :Co-financed Estimatedaward date: IV Quarter 2014
220 kV MOYOBAMBA -IQUITOS TRANSMISSION LINE AND ASSOCIATED SUB STATIONS CALLED • Location: Loreto and San Martín. • Description: The project comprises the concession to design, finance, build, operate, and maintain a transmission line with an approximated length of 600 km and capacity of 145 MVA, in order to incorporate the city of Iquitos to the National Interconnected System. • Estimated Investment (VAT not included): US$ 434 million • Type of concession: Self-sustaining • Concession period: 30 years plus the construction period (52 months) • Estimated award date: II Quarter 2014. Iquitos 600 Km Moyobamba BRAZIL PACIFIC OCEAN
220 KV LA PLANICIE INDUSTRIALES TRANSMISSION LINE AND ASSOCIATED SUBSTATIONS TO BE CALLED • Location:Lima • Description: The project comprises the concession to design, finance, build, operate, and maintain the transmission line with a length of 16.6 km and two circuits with 400 MVA capacity each. The last 5 km of the line will be underground. • Estimated investment (VAT not included): US$ 56.6 million • Type of concession : Self-sustaining • Concession period: 30 years plus the construction period (22 months approximately). • Estimated award date:II Quarter 2014
220 KV FRIASPATA - MOLLEPATA TRANSMISSION LINE AND 220/60 KV ORCOTUNA SUBSTATION CALLED • Location: Huancavelica, Ayacucho, Junín. • Description:The project comprises the concession to design, finance, build, operate and maintainof the following projects: • Mollepata – Friaspata transmission line of 90.5 k.m. and 192 MVA capacity and associated sub stations. • 220/60 kV new Orcotuna substation with 50 MVA capacity. • Both projects will allow to meet the energy demand in the regions involved. • Estimated investment (VAT not included): US$ 43.5 million • Type of concession : Self-sustained. • Concession period: 30 years plus the construction period (25 months approximately) • Estimated award date: II Quarter 2014 SE Orcotuna Friaspata Mollepata
1100 Mw ELECTRICITY SUPPLY TO BE CALLED Location: Nationwide. Description:Supply of power and energy to the National Interconnected Power System (SEIN) through several generators that guarantee the promised supply by building new hydroelectric power stations that will be commissioned from 2016 on. • Estimated investment: Under evaluation • Type of concession : Self-sustaining • Estimated date of award: IV Quarter 2014
ENERGY SECURITY AND SOUTHERN GAS PIPELINE • Location: Cusco, Arequipa and Moquegua. Description: The project comprises the concession to design, finance, build, operate, maintain and transfer of a natural gas distribution system. The project includes 2 sections: • Construction of natural gas pipelines and liquid gas pipelines from Malvinas plant to the Connection point (CP) and then to the Chinquintirca plant. • Construction of the Southern region gas pipeline from the Connection Point (CP) to south coast of the country. This comprises the following works: • Route 1: natural gas pipeline from the CP to Cusco • Route 2: Continuance of the gas pipeline to Ilo and Mollendo. • Estimated Investment (VAT not included): US$ 3,722 million • Type of concession: Self - sustaining • Estimated award date: I QT 2014 CALLED Camisea Malvinas PC Quillabamba Chiquintirca CUSCO PUNO AREQUIPA MOQUEGUA Mollendo Ilo TACNA
SUPPLY SYSTEM OF LNG FOR DOMESTIC MARKET CALLED • Location: Lima. • Description: The project comprises the concession to design, finance, build, operate and maintain a supply system of liquid natural gas with a capacity of 130,000 M3 in emergency situations for up to 7 days. • Estimated Investment (VAT not included): US$ 250 million. • Type of concession: Self-sustaining. • Concession term: 20 years plus the build period (30 months). • Estimated award date: IV Quarter 2014
CHILLÓN RIVER WATER SUPPLY WORKS TO BE CALLED POR CONVOCAR • Location: Lima. • Description: The project comprises the concession to design, finance, build, operate and maintain of dam works (approximately40 MM cubic meters) of Chillón river basin. • Estimated investment (VAT not included):US$ 45 million • Type of concession: Self- sustaining • Concession term: 20 to 30 years • Estimated award date: III Quarter 2014. Canta Ancón Matucana
MAIN WORKS AND CONDUCTION OF DRINKABLE WATER SUPPLY FOR LIMA • Location: Junín and Lima. • Description: The project comprises the concession to design, finance, build, operate and maintain of the following infrastructure works: • Extension capacity of Pomacocha and HuallacochaBajo dams (approx. 100 MM cubic meters ). • Diversion works of Pomacocha – River Blanco (approx. 10 km of trans Andean tunnel). • Water purification plant (5 m3/s), and • Southern conduction line Ramal Sur (approx. 25,6 km) from Huachipa to Villa del Triunfo districts, three tunnels of 4.2 k.m., 4.5 k.m., and 2.5 k.m.; and 6 support reservoirs of 24,000 cubic meters. • Estimated Investment (VAT not included): US$ 400 million • Type of concession: Self -sustained • Concession term: 20 to 30 years • Estimated award date: IV Quarter 2014. TO BE CALLED POR CONVOCAR P H Trans Andean tunnel Blanco River Water Purification Plant Rimac River Southern conduction line
MANAGEMENT OF THE INSTITUTO NACIONAL DE SALUD DEL NIÑO – SAN BORJA • Location: Lima. • Description: The project comprises in the provision, by a private operator, of the following services: • Maintenance of buildings, facilities and electromechanical equipment associated with infrastructure, landscaping and parking • Maintenance of the clinical and not-clinical equipment • General services (laundry, kitchen, cleaning service and security and hospital waste management) • Support to the diagnose (Laboratory, clinical pathology, blood bank and sterilization center) • Technical assistance services for acquisition • Type of concession: Co-financed • Contract term: 10 years. • Estimated award date: I Quarter 2014. CALLED
BUILD, EQUIP AND COMPLEMENTARY SERVICES IN ESSALUD AND MINSA HOSPITALS TO BE CALLED • Location:Lima, Piura, Lambayeque, Arequipa and Huaraz. • Description:The project comprises the concession to design, build, equip, operate, maintain complementary services in the following hospitals: • Sergio Bernales MINSA • Dos de Mayo MINSA • Hospital Piura Essalud • Hospital Chiclayo Essalud • Hospital Arequipa Essalud • Hospital Chimbote Essalud • Estimatedinvestment: Studies in progess • Estimatedaward date: 2015
INTEGRAL MANAGEMENT OF SOLID WASTE FROM HOSPITALS IN METROPOLITAN LIMA AND CALLAO TO BE CALLED • Location:Lima and Callao • Description:A private initiative involving the construction, operation and maintenance of a modern hospital waste treatment plant for the appropriate management of this type of waste (hazardous-biocontaminated/special-hazardous/regular) from hospitals and institutes of the Ministry of Health in Lima and Callao. • The project will be executed on the basis of other existing infrastructure public works owned by the Peruvian Government. • Estimated Investment: Studies in progress • Type of concession: Co-financed • Estimatedaward date: 2015
CABLECAR TO KUELAP CALLED • Location: Amazonas. • Description: The project comprises the concession to design, finance, build, operate and maintain a cableway system for a fast, safe and easy access to Kuelap Fortress. • The cable cars route will be 4,400 meters aimed to overcome the distance of 965 meters between Tingo Nuevo town and Kuelapfortress. • Estimated investment (VAT not included): US$ 17.6 million • Type of concession: Co- financed • Concession term: 20 – 25 years • Estimated award date: II Quarter 2014.
CHOQUEQUIRAO CABLE RAILWAY TO BE CALLED • Location: Apurímac and Cusco • Description:Concession of the design, financing, construction, equipment, operation and maintenance of a cable railwaysystemto access the Choquequirao Archaeological Park in a fast and comfortable way. • ItwillcrosstheApurimacCanyon and willhave 5.4 Km long, divided in 2 sections (3.4 Km and 1.99 Km), and capacity for 400 passengers/hour. • Estimated investment (VAT not included): US$ 55 million • Type of concession : Co-financed • Concession period: 20-25 years • Estimated date of award: IV Quarter2014
PROVISION OF TECHNOLOGICAL SECURITY SERVICES IN PRISONS Location: 33 Correctional Facilities nationwide Description: A private initiative declared to be of interest, created to upgrade the security in correctional facilities through the application of the following technologies: • Blockers of mobile phone signals and WiFi networks. • Public use telephones under established security conditions. • EstimatedInvestment (VAT notincluded): US $ 4.1 million • Type of concession : Self-sustaining • Concessionterm: 25 years Deadline for the presentation of interested parties: January 17, 2014 Estimatedaward date: I Quarter 2014 (Ifthirdparties do notappear)
ELECTRONIC PERSONAL MONITORING TO BE CALLED • Location: Lima and Callao • Description: A private initiative for the provision of Electronic Personal Monitoring services aiming at decongesting the Peruvian correctional facilities through the use of electronic tagging devices on prosecuted or sentenced inmates that may have access to this benefit, in their places of residence or under restricted transit conditions. • Estimated Investment: Under evaluation • Type of concession : Self-sustaining • Estimatedaward date: IV Quarter 2014
RELOCATION OF PENAL FACILITIES TO BE CALLED • Location: Lima and Cusco • Description: Relocation of 4 penal facilitieslocated in urbanareas of Metropolitan Lima and Cusco, fulfilling the necessary conditions for the treatment process of the inmates. • Penal facilitiesconsidered are: • Mujeres Chorrillos (Common) and Annex. • Lurigancho • Miguel Castro Castro. • Cusco and EP Cusco Women • EstimatedInvestment: Underevaluation • Estimatedaward date: I Quarter 2015
PENAL INFRASTRUCTURE AND URBAN RENEWAL “TINKUY PLAZA PROJECT” TO BE CALLED • Location: Lima • Description: The project proposes the construction of a commercial center, housing, warehouses and parking lots in the land of the current San Jorge Prison (Metropolitan Lima). It also includes the construction and equipment of a new prison for the transfer of inmates of San Jorge Prison into a state owned property – to be defined. • Estimated investment : Under evaluation • Concession type: Self sustaining • Estimated award date: 2015
HUAYDAY AMBARA MINING PROSPECT TO BE CALLED LA LIBERTAD Location: La Libertad. Description: The project involves a mining concession with a total area of 2992 ha . There are coal stratums identified as “clean anthracite” with probable estimated reserves of 1.8 million MT that offers a high potential for exploration. Estimated award date: II Quarter 2014 LUCMA
COMPREHENSIVE AGRICULTURAL, WATER AND MINING PROJECT IN PIURA TO BE CALLED • Location: Piura • Description: This project will be performed in two stages : • First stage: Design, financing, construction, operation and maintenance of an ore benefit Plant which shall process the gold ore extracted by formal miners and miners under formalization process who operate within the Piura region. • Second stage: Promotion of a portfolio of agriculture and livestock development projects and others that are intended to solve problems related to water for domestic and agriculture purposes in the influence area of the formal mining operations. • Estimated award date : IV Quarter 2014 Location of the ore benefit plant Operations area of informal mining PACIFIC OCEAN