PHENIX Start-up Status

PHENIX Start-up Status. Takao Sakaguchi (BNL), Run Coordinator Kieran Boyle (RBRC), Spin Coordinator Sasha Bazilevsky (RBRC), Trigger Coordinator f or the PHENIX Collaboration. Activity since last meeting. West VTX detector arm has been installed.

luella
Download Presentation

PHENIX Start-up Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHENIX Start-up Status Takao Sakaguchi (BNL), Run Coordinator Kieran Boyle (RBRC), Spin Coordinator Sasha Bazilevsky (RBRC), Trigger Coordinator for the PHENIX Collaboration

  2. Activity since last meeting • West VTX detector arm has been installed. • Electronics and DCMs are in place and being exercised to readout. • All of the new DCM II's needed to readout VTX are now available. • Standalone readout test of the pixel detector showed 99.4% of the detector alive. • Standalone readout test of the strip detector also succeeded. 100% (all of 112 modules) alive. • This afternoon, the East VTX detector will be installed. • Work on Muon Trigger Electronics and Resistive Plate Chamber No.3 are in good progress as planned. • On schedule to be done week of Dec 20. No delay is expected. • Roll-in East Carriage on or about Dec 3. • After the roll-in we need to reconnect EC, check-out all safety systems, build shield wall, final sign-off to start flammable gas flow. • Begin cosmic ray operations (~ Dec 21) for Muon Trigger timing setup. Excellent support for 1008 work continues from Lab HVAC people, riggers, carpenters, C-AD surveyors and techs!

  3. West VTX detector installed

  4. West VTX with beam pipe