Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II. 1. Photo Document Project County of San Diego DEPARTMENT OF GENERAL SERVICES August 1, 2008. Order of Review. 2. Overview of Phase I Results Treatment Train Site Preparation Construction
E N D
Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II 1 Photo Document Project County of San Diego DEPARTMENT OF GENERAL SERVICES August 1, 2008
Order of Review 2 Overview of Phase I Results Treatment Train Site Preparation Construction Post Construction Porous Pavement Site Preparation Construction Post Construction Rain Event Results to Date
N 7 Porous Concrete 14,936 s.f. Porous Asphalt 40,126 s.f. Pavers 7,896 s.f. Reference Area. M12A 4 11 Porous Pavement Center COC 62,958 s.f.
Targeted Pollutants of Concern • Suspended Solids • Oil/Grease • Metals (Copper, Zinc, Chromium, Cadmium) • Organics • Nitrogen • Note: These are consistent between Phase I and Phase II. 6
Phase II 9
10 Current and Proposed Porous Pavement and Treatment TrainLocations
Phase II Expansion • Three additional media filtration units • Three additional porous paving test plots (54,000 sf) • One additional porous concrete test plot • Two additional porous asphalt test plots • Geogrid stabilization under 1/2 of each new porous asphalt test plot • 26,000 sf of roof runoff diverted to porous asphalt test beds • Enhanced monitoring to evaluate current/expanded BMP effectiveness 11
TREATMENT TRAIN Site Preparation 14
TREATMENT TRAIN 15 Site Preparation and Excavation
TREATMENT TRAIN 16 Excavation Around Phase 1 Treatment Train
TREATMENT TRAIN CONSTRUCTION 17
TREATMENT TRAIN 20 Installation of MFS and Storm Filter Chambers
TREATMENT TRAIN 21 Installation of MFS and Storm Filter Chambers
TREATMENT TRAIN 26 Installation of Diversion Pipe and Monitoring Boxes
TREATMENT TRAIN 28 Backfilling Treatment Train
TREATMENT TRAIN Maintenance 30
TREATMENT TRAIN 29 CONSTRUCTION
TREATMENT TRAIN 31 MSF Unit Replacement Filter
TREATMENT TRAIN 32 Filter Replacement of Phase 1 MSF Unit
CDS PRE-TREATMENT CLEAN-OUT 33 After Three Rain Events
POROUS PAVEMENT Site Preparation 34
POROUS PAVEMENT 35 Excavation Engraving
POROUS PAVEMENT CONSTRUCTION 37
POROUS PAVEMENT 38 Installation of Subsurface Overflow Drainage and Monitoring System
POROUS PAVEMENT 39 CONSTRUCTION
41 POROUS ASPHALT PROFILE
POROUS PAVEMENT 44 Installation of Geotech Style Fabric and Aggregate
POROUS PAVEMENT 45 Installation of Geogrip Re-enforcement
POROUS PAVEMENT 52 Porous Asphalt Overlain Aggregate Bed
POROUS PAVEMENT 50 Installation of Porous Asphalt
POROUS PAVEMENT 47 Installation of Porous Concrete
48 POROUS PAVEMENT Porous Concert Curing Process
POROUS PAVEMENT POST CONSTRUCTION 54
POROUS PAVEMENT 55 Asphalt concrete Interface
POROUS PAVEMENT 56 POST-CONSTRUCTION
POROUS PAVEMENT 57 Porous Concrete Infiltration
58 POROUS PAVEMENT Porous Asphalt Infiltration
POROUS PAVEMENT 59 Rain Event November 30, 2007
POROUS PAVEMENT 60 RAIN EVENT (11/30/2007)
61 POROUS PAVEMENT RAIN EVENT (11/30/2007)
62 POROUS PAVEMENT RAIN EVENT (11/30/2007)
63 POROUS PAVEMENT RAIN EVENT (11/30/2007)
64 Results to Date