Idaho Roads Scholar Program. PAVEMENT MAINTENANCE II. Part 1b: Chip Seal Construction. Objectives. Review how to set up a good chip seal, Investigate equipment operation, and field checks, Identify common problems and possible solutions. Field Checks. Weather/Surface Condition
E N D
Idaho Roads Scholar Program PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction
Objectives • Review how to set up a good chip seal, • Investigate equipment operation, and field checks, • Identify common problems and possible solutions.
Field Checks • Weather/Surface Condition • Traffic Control • Aggregate • Asphalt • Asphalt and Chip Distributor • Rollers • Sweeping
Weather/Surface Condition • Dry or Damp Surface • Temperature • Rain/Humidity • Wind
Aggregate Requirements for Successful Seal Coat • Must be clean. • Less then 1% passing #200 sieve. • Cubical chips are better then flat chips. • Must be crushed. • At least 2 crushed faces. • More single sized the better.
Dirty Chips • > 1% passing the #200 sieve • Impedes the ability of binder to bond chip to roadway. • Limits amount of binder that can be applied. • Creates dust after sweeping.
Aggregate Condition • Emulsions => Damp Surface • Asphalt Cement => Dry Surface
Chip Considerations • Can only glue down a single layer of chips. • Must have chips at least 60 to 70% embedded to withstand traffic and snow plow damage. • Should see emulsion at top of chips before emulsion breaks.
Asphalt Distributor Components • Nozzles • Spray Bar Height • Application Rate • Product Temperature
Test Shot • Apply Asphalt Product for Known Distance & Width • Calculate Amount of Applied Asphalt Product • Calculate Spread Rate
Product Temperature • Typically 140 to 185oF • Check At Distributor
Common Emulsion: CRS-2P • Develops strength in hours that normally take days. • Sweep same day. • Requires clean chips. • Must place chips within one minute of placement of binder. • Eliminates bleeding • Higher softening point
Sample Asphalt Product • Sample Location • Truck or Trailer • Nozzle • Sample Container • 1 Gallon Plastic w/Lined Screw Cap, Wide Mouth
Chip Spreader Issues • Correct Application Rate • Uniform Application Rate
Test Shot to Insure Correct Application Rate • Apply aggregate for known distance and width • Calculate Amount of Aggregate • Calculate Spread Rate
Check Rollers • Type • Weight • Speed
Factors Affecting Breaking and Curing • Weather Conditions: • temperature, humidity, wind • Water Absorption • Aggregate moisture content: • although wet aggregate may facilitate coating, it tends to slow the curing process • Mechanical forces: • roller pressure forces water from mix • Surface area: • excessive fines or dirty aggregate accelerate breaking • Surface chemistry
Safety • Approved Vests • Communication • Eye Contact
Typical Problems • Streaked Appearance • Bleeding/Flushing • Loss of Cover Aggregate • Bad Centerline Joint • Utilities/New Patches • Tight Alignment or Steep Grades • Heavy Tree Canopy • Fall Weather
Rules of Thumb for Seal Coats • Make sure pavement is clean • Use high quality materials • Proper application rate for binder • Proper application rate for aggregates. Extra aggregates only cause failure. • Keep distance between the distributor and the chipper to minimum. Aggregate must be placed before emulsion starts to break.
Rules of Thumb for Seal Coats, cont. • Minimum of three rollers. Keep speed under 5 mph. Compaction must be completed before emulsion is broken. • Final sweeping of roadway as soon as possible. No later then the next morning. • Remember that Details count.
Questions? Chip Seals