PAVEMENT MAINTENANCE II

Idaho Roads Scholar Program. PAVEMENT MAINTENANCE II. Part 1b: Chip Seal Construction. Objectives. Review how to set up a good chip seal, Investigate equipment operation, and field checks, Identify common problems and possible solutions. Field Checks. Weather/Surface Condition

aviva
Download Presentation

PAVEMENT MAINTENANCE II

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Idaho Roads Scholar Program PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction

  2. Objectives • Review how to set up a good chip seal, • Investigate equipment operation, and field checks, • Identify common problems and possible solutions.

  3. Field Checks • Weather/Surface Condition • Traffic Control • Aggregate • Asphalt • Asphalt and Chip Distributor • Rollers • Sweeping

  4. Weather/Surface Condition • Dry or Damp Surface • Temperature • Rain/Humidity • Wind

  5. Surface Temperature

  6. Proper Traffic Control is Essential!

  7. Aggregate Requirements for Successful Seal Coat • Must be clean. • Less then 1% passing #200 sieve. • Cubical chips are better then flat chips. • Must be crushed. • At least 2 crushed faces. • More single sized the better.

  8. Dirty Chips • > 1% passing the #200 sieve • Impedes the ability of binder to bond chip to roadway. • Limits amount of binder that can be applied. • Creates dust after sweeping.

  9. Aggregate Condition • Emulsions => Damp Surface • Asphalt Cement => Dry Surface

  10. Chip Considerations • Can only glue down a single layer of chips. • Must have chips at least 60 to 70% embedded to withstand traffic and snow plow damage. • Should see emulsion at top of chips before emulsion breaks.

  11. Which are the better chips?

  12. Distributors

  13. Asphalt Distributor Components • Nozzles • Spray Bar Height • Application Rate • Product Temperature

  14. Nozzle Angle

  15. Spray Bar Height

  16. Triple Coverage

  17. Test Shot • Apply Asphalt Product for Known Distance & Width • Calculate Amount of Applied Asphalt Product • Calculate Spread Rate

  18. Product Temperature • Typically 140 to 185oF • Check At Distributor

  19. Common Emulsion: CRS-2P • Develops strength in hours that normally take days. • Sweep same day. • Requires clean chips. • Must place chips within one minute of placement of binder. • Eliminates bleeding • Higher softening point

  20. Sample Asphalt Product • Sample Location • Truck or Trailer • Nozzle • Sample Container • 1 Gallon Plastic w/Lined Screw Cap, Wide Mouth

  21. Chip Spreaders

  22. Chip Spreader Issues • Correct Application Rate • Uniform Application Rate

  23. Test Shot to Insure Correct Application Rate • Apply aggregate for known distance and width • Calculate Amount of Aggregate • Calculate Spread Rate

  24. Check Rollers • Type • Weight • Speed

  25. Rolling

  26. Best Pneumatic-Tire Roller

  27. Buns Up: Check Embedment

  28. Factors Affecting Breaking and Curing • Weather Conditions: • temperature, humidity, wind • Water Absorption • Aggregate moisture content: • although wet aggregate may facilitate coating, it tends to slow the curing process • Mechanical forces: • roller pressure forces water from mix • Surface area: • excessive fines or dirty aggregate accelerate breaking • Surface chemistry

  29. Broom

  30. Safety • Approved Vests • Communication • Eye Contact

  31. Typical Problems • Streaked Appearance • Bleeding/Flushing • Loss of Cover Aggregate • Bad Centerline Joint • Utilities/New Patches • Tight Alignment or Steep Grades • Heavy Tree Canopy • Fall Weather

  32. Common Chip Seal Problems

  33. Rules of Thumb for Seal Coats • Make sure pavement is clean • Use high quality materials • Proper application rate for binder • Proper application rate for aggregates. Extra aggregates only cause failure. • Keep distance between the distributor and the chipper to minimum. Aggregate must be placed before emulsion starts to break.

  34. Rules of Thumb for Seal Coats, cont. • Minimum of three rollers. Keep speed under 5 mph. Compaction must be completed before emulsion is broken. • Final sweeping of roadway as soon as possible. No later then the next morning. • Remember that Details count.

  35. Questions? Chip Seals